Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base

In order to verify the interlayer bonding effect of double-layer continuous paving technology of the thick cement-stabilized base and solve the construction quality control problem of the double-layer continuous paving, based on the interlayer bonding mechanism and the evenness passing mechanism, th...

Full description

Saved in:
Bibliographic Details
Main Authors: LongTing Ding, Xuancang Wang, Mengyuan Zhang, Jiaqi Meng, Tao Hu
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/8845642
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832566488376016896
author LongTing Ding
Xuancang Wang
Mengyuan Zhang
Jiaqi Meng
Tao Hu
author_facet LongTing Ding
Xuancang Wang
Mengyuan Zhang
Jiaqi Meng
Tao Hu
author_sort LongTing Ding
collection DOAJ
description In order to verify the interlayer bonding effect of double-layer continuous paving technology of the thick cement-stabilized base and solve the construction quality control problem of the double-layer continuous paving, based on the interlayer bonding mechanism and the evenness passing mechanism, the laboratory interlayer adhesion test, field test of evenness disturbance, and compaction test were conducted to verify the continuous paving interlayer bonding state. The effect of interval time on interlayer bonding state, evenness, and compactness was analyzed, and construction quality control measures were proposed. The test results show that the double-layer continuous paving process could significantly improve the interlayer bonding state, but there is still a gap from the ideal state (completely continuous). The pull-off strength of continuous paving specimens was 2.1 times that of the discontinuous paving specimens; the shear strength was 2.4 times that of discontinuous paving specimens. At different paving intervals, the longitudinal evenness of the upper and lower layers has little difference. The 140 kN axle load controls the transverse evenness disturbance within 3 mm, which met the requirements of the specification. Based on the evenness passing mechanism, the evenness control standard of double-layer continuous paving base was proposed. The compaction process of double-layer continuous paving base was proposed, and the feasibility was verified through the field test of compaction. The best interval time for double-layer continuous paving was also proposed; it is recommended that the best time for paving the upper layer is after the lower layer is laid for 6 hours (the final setting time of the cement). The construction quality control measures proposed in this study provide a theoretical basis for the construction of double-layer continuous paving technology with thick cement-stabilized base.
format Article
id doaj-art-7ccf80398c504b63a3ead5a88fed7a23
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-7ccf80398c504b63a3ead5a88fed7a232025-02-03T01:03:57ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88456428845642Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized BaseLongTing Ding0Xuancang Wang1Mengyuan Zhang2Jiaqi Meng3Tao Hu4School of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaSchool of Highway, Chang’an University, Xi’an 710064, ChinaIn order to verify the interlayer bonding effect of double-layer continuous paving technology of the thick cement-stabilized base and solve the construction quality control problem of the double-layer continuous paving, based on the interlayer bonding mechanism and the evenness passing mechanism, the laboratory interlayer adhesion test, field test of evenness disturbance, and compaction test were conducted to verify the continuous paving interlayer bonding state. The effect of interval time on interlayer bonding state, evenness, and compactness was analyzed, and construction quality control measures were proposed. The test results show that the double-layer continuous paving process could significantly improve the interlayer bonding state, but there is still a gap from the ideal state (completely continuous). The pull-off strength of continuous paving specimens was 2.1 times that of the discontinuous paving specimens; the shear strength was 2.4 times that of discontinuous paving specimens. At different paving intervals, the longitudinal evenness of the upper and lower layers has little difference. The 140 kN axle load controls the transverse evenness disturbance within 3 mm, which met the requirements of the specification. Based on the evenness passing mechanism, the evenness control standard of double-layer continuous paving base was proposed. The compaction process of double-layer continuous paving base was proposed, and the feasibility was verified through the field test of compaction. The best interval time for double-layer continuous paving was also proposed; it is recommended that the best time for paving the upper layer is after the lower layer is laid for 6 hours (the final setting time of the cement). The construction quality control measures proposed in this study provide a theoretical basis for the construction of double-layer continuous paving technology with thick cement-stabilized base.http://dx.doi.org/10.1155/2020/8845642
spellingShingle LongTing Ding
Xuancang Wang
Mengyuan Zhang
Jiaqi Meng
Tao Hu
Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
Advances in Civil Engineering
title Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
title_full Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
title_fullStr Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
title_full_unstemmed Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
title_short Construction Quality Control Study of Double-Layer Continuous Paving for Large-Thickness Cement-Stabilized Base
title_sort construction quality control study of double layer continuous paving for large thickness cement stabilized base
url http://dx.doi.org/10.1155/2020/8845642
work_keys_str_mv AT longtingding constructionqualitycontrolstudyofdoublelayercontinuouspavingforlargethicknesscementstabilizedbase
AT xuancangwang constructionqualitycontrolstudyofdoublelayercontinuouspavingforlargethicknesscementstabilizedbase
AT mengyuanzhang constructionqualitycontrolstudyofdoublelayercontinuouspavingforlargethicknesscementstabilizedbase
AT jiaqimeng constructionqualitycontrolstudyofdoublelayercontinuouspavingforlargethicknesscementstabilizedbase
AT taohu constructionqualitycontrolstudyofdoublelayercontinuouspavingforlargethicknesscementstabilizedbase