Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2

PT Wijaya Karya (Persero) Tbk, a leading state-owned construction enterprise, faces significant waste management challenges that have caused financial losses in previous projects. This study applies lean construction and risk management to identify waste and risks in the Jragung Dam Construction Pro...

Full description

Saved in:
Bibliographic Details
Main Authors: Hanif Adriantama Muhammad, Agung Wibowo Mochammad, Utomo Dwi Hatmoko Jati
Format: Article
Language:English
Published: EDP Sciences 2025-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2025/05/e3sconf_icenis2024_03019.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832098521207013376
author Hanif Adriantama Muhammad
Agung Wibowo Mochammad
Utomo Dwi Hatmoko Jati
author_facet Hanif Adriantama Muhammad
Agung Wibowo Mochammad
Utomo Dwi Hatmoko Jati
author_sort Hanif Adriantama Muhammad
collection DOAJ
description PT Wijaya Karya (Persero) Tbk, a leading state-owned construction enterprise, faces significant waste management challenges that have caused financial losses in previous projects. This study applies lean construction and risk management to identify waste and risks in the Jragung Dam Construction Project Package 2. Waste identification began with brainstorming sessions with the project management team, followed by a borda questionnaire to prioritize waste using the pareto principle. 5-whys discussions were then used to determine the risks causing critical waste. These risks were categorized using the Risk Breakdown Structure (RBS) and analysed through Failure Mode and Effect Analysis (FMEA), with risks plotted on a cartesian diagram based on Risk Priority Number (RPN) and Risk Severity Value (RSV). The four critical waste types identified were defects (20.05%), waiting (19.80%), over-processing (17.79%), and overproduction (14.04%). The highest-priority risks were unfinished diversion channels (RPN 108, RSV 36), geological issues found (RPN 105, RSV 35), and design revision (RPN 96, RSV 32). The benefit of this research is a systematic approach for identifying waste through lean construction and risk management principles, facilitating targeted waste identification. This process is expected to help the company make informed decisions, enhancing project efficiency and reducing potential financial losses.
format Article
id doaj-art-7bcd693248c3481a84ee87710087ab6b
institution Kabale University
issn 2267-1242
language English
publishDate 2025-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj-art-7bcd693248c3481a84ee87710087ab6b2025-02-05T10:49:10ZengEDP SciencesE3S Web of Conferences2267-12422025-01-016050301910.1051/e3sconf/202560503019e3sconf_icenis2024_03019Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2Hanif Adriantama Muhammad0Agung Wibowo Mochammad1Utomo Dwi Hatmoko Jati2Civil Engineering Department, Faculty of Engineering, Universitas DiponegoroCivil Engineering Department, Faculty of Engineering, Universitas DiponegoroCivil Engineering Department, Faculty of Engineering, Universitas DiponegoroPT Wijaya Karya (Persero) Tbk, a leading state-owned construction enterprise, faces significant waste management challenges that have caused financial losses in previous projects. This study applies lean construction and risk management to identify waste and risks in the Jragung Dam Construction Project Package 2. Waste identification began with brainstorming sessions with the project management team, followed by a borda questionnaire to prioritize waste using the pareto principle. 5-whys discussions were then used to determine the risks causing critical waste. These risks were categorized using the Risk Breakdown Structure (RBS) and analysed through Failure Mode and Effect Analysis (FMEA), with risks plotted on a cartesian diagram based on Risk Priority Number (RPN) and Risk Severity Value (RSV). The four critical waste types identified were defects (20.05%), waiting (19.80%), over-processing (17.79%), and overproduction (14.04%). The highest-priority risks were unfinished diversion channels (RPN 108, RSV 36), geological issues found (RPN 105, RSV 35), and design revision (RPN 96, RSV 32). The benefit of this research is a systematic approach for identifying waste through lean construction and risk management principles, facilitating targeted waste identification. This process is expected to help the company make informed decisions, enhancing project efficiency and reducing potential financial losses.https://www.e3s-conferences.org/articles/e3sconf/pdf/2025/05/e3sconf_icenis2024_03019.pdf
spellingShingle Hanif Adriantama Muhammad
Agung Wibowo Mochammad
Utomo Dwi Hatmoko Jati
Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
E3S Web of Conferences
title Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
title_full Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
title_fullStr Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
title_full_unstemmed Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
title_short Implementation of Lean Construction and Risk Management for Waste Identification in the Jragung Dam Construction Project Package 2
title_sort implementation of lean construction and risk management for waste identification in the jragung dam construction project package 2
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2025/05/e3sconf_icenis2024_03019.pdf
work_keys_str_mv AT hanifadriantamamuhammad implementationofleanconstructionandriskmanagementforwasteidentificationinthejragungdamconstructionprojectpackage2
AT agungwibowomochammad implementationofleanconstructionandriskmanagementforwasteidentificationinthejragungdamconstructionprojectpackage2
AT utomodwihatmokojati implementationofleanconstructionandriskmanagementforwasteidentificationinthejragungdamconstructionprojectpackage2