Simultaneous Optimization of Train Timetabling and Platforming Problems for High-Speed Multiline Railway Network
The optimization problems of train timetabling and platforming are two crucial problems in high-speed railway operation; these problems are typically considered sequentially and independently. With the construction of high-speed railways, an increasing number of interactions between trains on multip...
Saved in:
Main Authors: | Qin Zhang, Xiaoning Zhu, Li Wang, Shuai Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Journal of Advanced Transportation |
Online Access: | http://dx.doi.org/10.1155/2021/6679008 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Genetic Algorithm-Based Particle Swarm Optimization Approach to Reschedule High-Speed Railway Timetables: A Case Study in China
by: Mingming Wang, et al.
Published: (2019-01-01) -
Optimization Based High-Speed Railway Train Rescheduling with Speed Restriction
by: Li Wang, et al.
Published: (2014-01-01) -
Optimizing Train Timetable Based on Departure Time Preference of Passengers for High-Speed Rails
by: Zhipeng Huang, et al.
Published: (2021-01-01) -
Coordination and Optimization of Long-Distance Passenger Departure Timetable Connected to High-Speed Railway Station: Considering the Heterogeneity of Transfer Passengers Demand
by: Bing Zhang, et al.
Published: (2022-01-01) -
Robust Train Scheduling Problem with Optimized Maintenance Planning on High-Speed Railway Corridors: The China Case
by: Chuntian Zhang, et al.
Published: (2018-01-01)