Key Technologies for Large-span Mined Metro Tunnel Construction Using Superimposed Arch-wall Method
[Objective] When using sequential excavation methods such as central diaphragm walls and double-side heading techniques to construct large-span mined metro tunnels, temporary supports often hinder the effective use of large-scale mechanized operations. To meet the requirements of low-vibration mecha...
Saved in:
| Main Authors: | HU Qifan, ZHU Zhanguo, GUO Jiaxing, SUN Yu, ZHAO Bin, XIONG Chunlin, CHEN Xiaobin |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-07-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20241154.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research on Deformation Patterns and Influencing Factors of Ten Pilot Tunnel Pile Method Construction in Large Span Metro Stations
by: ZHOU Tao
Published: (2025-01-01) -
Simulation Analysis of Air Distribution in the Public Area of Single-Span Arch-Shaped Underground Station under the Centralized Air Return Mode
by: FENG Rao, et al.
Published: (2025-01-01) -
Technical and economic analysis of full and empty crossing methods in the sequence of station and tunnel construction in Tehran metro line seven
by: Seyed Amirhossein Ghoreishian, et al.
Published: (2020-11-01) -
Exploration and Practice of New Underground Excavation Method for Large Span Metro Station in Urban Area
by: WANG Xiang, et al.
Published: (2025-07-01) -
Deformation Law of Metro Station Underground Excavation by Arch Column Method in Upper-Soft and Lower-Hard Strata
by: WANG Xiang, et al.
Published: (2025-04-01)