The Ground Settlement and the Existing Pipeline Response Induced by the Nonsynchronous Construction of a Twin-Tunnel
Shielding tunnel construction always has negative impacts on the surrounding buildings. Because of repeated disturbances caused by the construction, more attention should be paid to the impacts of the nonsynchronous construction of a twin-tunnel. In this research, a three-dimensional model was estab...
Saved in:
Main Authors: | Shicheng Sun, Chuanxin Rong, Houliang Wang, Linzhao Cui, Xin Shi |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/8815304 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Ground Settlements due to Construction of Triplet Tunnels with Different Construction Arrangements
by: Ahsan Naseem, et al.
Published: (2019-01-01) -
Predictive Model for Deformation of Adjacent Pipelines Caused by Tunnel Boring in Twin-Lane Tunnels in Soft Ground Layers
by: Kezhong Wang, et al.
Published: (2025-01-01) -
Effects of Different Construction Sequences on Ground Surface Settlement and Displacement of Single Long Pile due to Twin Paralleled Shield Tunneling
by: Kan Huang, et al.
Published: (2021-01-01) -
Numerical Analysis of Pipelines Settlement Induced by Tunneling
by: KunYong Zhang, et al.
Published: (2019-01-01) -
Modification of Peck Formula to Predict Ground Surface Settlement of Twin Tunnels in Low Permeability Soil
by: Xiaowu Tang, et al.
Published: (2021-01-01)