Increasing Robustness by Reallocating the Margins in the Timetable
It is a common practice to improve the punctuality of a railway service by the addition of time margins during the planning process of a timetable. Due to the capacity constraints of the railway network, a limited amount of time margins can be inserted. The paper presents a model and heuristic techn...
Saved in:
Main Authors: | Lingyun Meng, Malik Muneeb Abid, Xinguo Jiang, Afaq Khattak, Muhammad Babar Khan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Journal of Advanced Transportation |
Online Access: | http://dx.doi.org/10.1155/2019/1382394 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Heuristic Algorithm for Resource Allocation/Reallocation Problem
by: S. Raja Balachandar, et al.
Published: (2011-01-01) -
Estimating Potential for Drug Budget Reallocation Following Expiration of Exclusivity of Pharmaceutical Products
by: Samira Toghanian, et al.
Published: (2022-02-01) -
European tourism demand in the face of climate change: asymmetric impacts, demand reallocation, and deseasonalisation strategies
by: David García-León, et al.
Published: (2025-01-01) -
Timetable Design for Urban Rail Line with Capacity Constraints
by: Yu-Ting Zhu, et al.
Published: (2015-01-01) -
Global Optimization for Bus Line Timetable Setting Problem
by: Qun Chen
Published: (2014-01-01)