The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization
The prediction of construction cost of metro shield engineering is of great significance to project management. In this study, we used the rough set theory, a backpropagation (BP) neural network, and quantum particle swarm optimization (QPSO) to establish a prediction model for predicting the metro...
Saved in:
Main Authors: | Lanjun Liu, Denghui Liu, Han Wu, Xinyu Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/6692130 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Deformation Characterisation and Distress Diagnosis of a Metro Shield Tunnel by Adjacent Constructions
by: Ting-jin Liu, et al.
Published: (2020-01-01) -
Structural Monitoring of Metro Infrastructure during Shield Tunneling Construction
by: L. Ran, et al.
Published: (2014-01-01) -
A Hybrid Forecasting Model Based on Bivariate Division and a Backpropagation Artificial Neural Network Optimized by Chaos Particle Swarm Optimization for Day-Ahead Electricity Price
by: Zhilong Wang, et al.
Published: (2014-01-01) -
The Prediction of Pile Foundation Buried Depth Based on BP Neural Network Optimized by Quantum Particle Swarm Optimization
by: Fei Yin, et al.
Published: (2021-01-01) -
A Network Traffic Prediction Model Based on Quantum-Behaved Particle Swarm Optimization Algorithm and Fuzzy Wavelet Neural Network
by: Kun Zhang, et al.
Published: (2016-01-01)