Influence of Different Excavation Sequence of Double-Side Heading Method on Supporting Structure
The double-side heading method is often used in the construction of large-span and large-section tunnels. The excavation of the pilot tunnel is complex, so the construction efficiency is low. Based on the underground excavation tunnel project of a subway in Guangzhou, the section excavation sequence...
Saved in:
Main Authors: | Chengkun Ling, Yanmei Ruan, Pengbo Wu, Jin Li, Jin Zhao, Bingxiang Yuan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/2258594 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Transient dynamic analysis of cutter-head loads: effects of different cutter spacings during excavation
by: Minglei Kang, et al.
Published: (2025-01-01) -
A Precise Analysis of the Behavior of Pit Side Tunnels Caused by Deep Excavation
by: Huasheng Sun, et al.
Published: (2024-01-01) -
Surface Settlement Damage Model of Pile-Anchor Supporting Structure in Deep Excavation
by: Yuanxun Li, et al.
Published: (2020-01-01) -
Efficient Excavation and Support Cooperation Technology for Surrounding Rock of Deep Buried Long-Distance and Large Section Gob-Side Roadway: A Case Study
by: Houqiang Yang, et al.
Published: (2022-01-01) -
The dark side of double-tensor multiplets
by: L. Andrianopoli, et al.
Published: (2025-01-01)