Application of CIPP flipped lining method in the rehabilitation of old gas pipelines
Abstract With the increase of urban gas pipeline operation time, more and more underground gas pipelines are facing various problems, and old gas pipelines urgently need to be updated and repaired. Realizing the comprehensive excavation, demolition, and replacement of old pipes with new ones poses p...
Saved in:
| Main Authors: | You Yun, Wang xinxin, Wang Zhongyi, Wang Yuyan, Chen Hao |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2025-04-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-025-95155-y |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Feasibility study of FFPP thermoplastic lining for concrete pipeline rehabilitation: a case study
by: Dongmin Xi, et al.
Published: (2024-12-01) -
The Application of the CIPP Evaluation Model in Educational Programs in Indonesia
by: M. Zainuddin Alanshori, et al.
Published: (2025-07-01) -
CIPP EVALUATION MODEL IN LEARNING IN MADRASAH IBTIDAIYAH
by: Jesica Dwi Rahmayanti, et al.
Published: (2024-06-01) -
Evaluation of Teaching Campus With Context, Input, Process, and Product (CIPP) Model In Primary School
by: Ervina Damayanti, et al.
Published: (2024-12-01) -
Evaluasi Program Bimbingan dan Konseling Dengan Model CIPP
by: Nurtazkiyah Agista, et al.
Published: (2025-06-01)