The Usefulness of Adopting the Last Planner System in the Construction Process of Addis Ababa Road Projects
Addis Ababa road construction projects fail to be executed on time, within the allocated budget, and with the desired quality. To solve this problem, a new management concept is introduced, namely, lean construction. It is known to increase productivity and minimize waste. And, to realize this solut...
Saved in:
Main Authors: | Zenawi Mehari Limenih, Belachew Asteray Demisse, Abenezer Tariku Haile |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/7846593 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Assessment on the Current and Future Performance of Addis Ababa Light Rail Transit Service Using Mathematical Modeling
by: Getu Debebe, et al.
Published: (2022-01-01) -
Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
by: Adamu Beyene Negesa
Published: (2022-01-01) -
Sputum Smear Positive Pulmonary Tuberculosis Diagnostic Dropout Rate in Public Health Facilities, Addis Ababa, Ethiopia
by: Daniel Melese Desalegn, et al.
Published: (2019-01-01) -
Spatiotemporal dynamics and prevention strategies of cervical cancer incidence in Addis Ababa, Ethiopia: an ecological study
by: Mathewos Assefa, et al.
Published: (2025-01-01) -
ROITP: Road Obstacle-Involved Trajectory Planner for Autonomous Trucks
by: Yechen Qin, et al.
Published: (2025-02-01)