THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD

The necessity for scientific and methodical study of methods for monitoring the characteristics of flameresistance of building structures has the highest priority in the field of fire safety. The aim of this work was to provide the required degree of reliability of the results of quality control of...

Full description

Saved in:
Bibliographic Details
Main Authors: P. S. Serenkov, V. L. Hurevich, M. R. Movlamov, A. S. Yetumya
Format: Article
Language:English
Published: Belarusian National Technical University 2018-06-01
Series:Приборы и методы измерений
Subjects:
Online Access:https://pimi.bntu.by/jour/article/view/377
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832543774392188928
author P. S. Serenkov
V. L. Hurevich
M. R. Movlamov
A. S. Yetumya
author_facet P. S. Serenkov
V. L. Hurevich
M. R. Movlamov
A. S. Yetumya
author_sort P. S. Serenkov
collection DOAJ
description The necessity for scientific and methodical study of methods for monitoring the characteristics of flameresistance of building structures has the highest priority in the field of fire safety. The aim of this work was to provide the required degree of reliability of the results of quality control of flame-resistant coatings of building structures and high efficiency of decisions due to the risk-based approach to the development of control methods.Substantiated risk-based approach to the development of methods of control, involving the consideration on the basis of process model, control flame-resistance of building object in all possible potential problems that can cause the risk of incorrect decision-making. A model of the risks arising from the control of the flameretardant coating thickness has been developed. Two major risk groups have been identified. The first group is related to the uncertainty of coating thickness measurement at a single control point. The second group of risks is related to the unrepresentativeness of selective control over the entire surface of the construction object as a whole Potential risk sources have been identified for each group. For the entire range of sources of particular risks the results of studies of the mechanisms of their manifestation, the estimated degree of influence on the accuracy of the control of compliance of flame-retardant coating thickness requirements. The analysis is carried out on the basis of both theoretical and experimental statistical studies on a number of construction projects.According to the results of the analysis of all particular risks of control unreliability, rational ways of their minimization in the form of technical or organizational and technical measures, which are refl in the developed project of the control method, are proposed. Project control method was built on the basis of a agreed scheme of control of the thickness of the fl coating of building structures sequentially the three parties. Formulated and solved the task of the metrological control of the thickness of the flame-retardant coating as indirect measurement methods non-destructive thickness measurements. Theoretical and applied aspects of the process of flame-retardant coating thickness control of building structures under conditions of high risk of making incorrect decisions on the results of control are considered.
format Article
id doaj-art-5d73b65160ad46d69903cec3b11ce71a
institution Kabale University
issn 2220-9506
2414-0473
language English
publishDate 2018-06-01
publisher Belarusian National Technical University
record_format Article
series Приборы и методы измерений
spelling doaj-art-5d73b65160ad46d69903cec3b11ce71a2025-02-03T11:28:27ZengBelarusian National Technical UniversityПриборы и методы измерений2220-95062414-04732018-06-019215516610.21122/2220-9506-2018-9-2-155-166315THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHODP. S. Serenkov0V. L. Hurevich1M. R. Movlamov2A. S. Yetumya3Belarusian National Technical UniversityBelarusian State Institute of MetrologyBelarusian State Institute of MetrologyFederal State-Financed Establishment, All-Russian Research Institute for Fire Protection of Ministry of Russian Federation for Civil Defense, Emergencies and Elimination of Consequences of Natural DisastersThe necessity for scientific and methodical study of methods for monitoring the characteristics of flameresistance of building structures has the highest priority in the field of fire safety. The aim of this work was to provide the required degree of reliability of the results of quality control of flame-resistant coatings of building structures and high efficiency of decisions due to the risk-based approach to the development of control methods.Substantiated risk-based approach to the development of methods of control, involving the consideration on the basis of process model, control flame-resistance of building object in all possible potential problems that can cause the risk of incorrect decision-making. A model of the risks arising from the control of the flameretardant coating thickness has been developed. Two major risk groups have been identified. The first group is related to the uncertainty of coating thickness measurement at a single control point. The second group of risks is related to the unrepresentativeness of selective control over the entire surface of the construction object as a whole Potential risk sources have been identified for each group. For the entire range of sources of particular risks the results of studies of the mechanisms of their manifestation, the estimated degree of influence on the accuracy of the control of compliance of flame-retardant coating thickness requirements. The analysis is carried out on the basis of both theoretical and experimental statistical studies on a number of construction projects.According to the results of the analysis of all particular risks of control unreliability, rational ways of their minimization in the form of technical or organizational and technical measures, which are refl in the developed project of the control method, are proposed. Project control method was built on the basis of a agreed scheme of control of the thickness of the fl coating of building structures sequentially the three parties. Formulated and solved the task of the metrological control of the thickness of the flame-retardant coating as indirect measurement methods non-destructive thickness measurements. Theoretical and applied aspects of the process of flame-retardant coating thickness control of building structures under conditions of high risk of making incorrect decisions on the results of control are considered.https://pimi.bntu.by/jour/article/view/377building constructionsflame-retardant coatingcoating thickness control methodrisk-oriented approachsources of risk of unreliable control
spellingShingle P. S. Serenkov
V. L. Hurevich
M. R. Movlamov
A. S. Yetumya
THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
Приборы и методы измерений
building constructions
flame-retardant coating
coating thickness control method
risk-oriented approach
sources of risk of unreliable control
title THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
title_full THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
title_fullStr THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
title_full_unstemmed THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
title_short THE RISK-ORIENTED APPROACH TO THE DEVELOPMENT OF CONTROL METHOD
title_sort risk oriented approach to the development of control method
topic building constructions
flame-retardant coating
coating thickness control method
risk-oriented approach
sources of risk of unreliable control
url https://pimi.bntu.by/jour/article/view/377
work_keys_str_mv AT psserenkov theriskorientedapproachtothedevelopmentofcontrolmethod
AT vlhurevich theriskorientedapproachtothedevelopmentofcontrolmethod
AT mrmovlamov theriskorientedapproachtothedevelopmentofcontrolmethod
AT asyetumya theriskorientedapproachtothedevelopmentofcontrolmethod
AT psserenkov riskorientedapproachtothedevelopmentofcontrolmethod
AT vlhurevich riskorientedapproachtothedevelopmentofcontrolmethod
AT mrmovlamov riskorientedapproachtothedevelopmentofcontrolmethod
AT asyetumya riskorientedapproachtothedevelopmentofcontrolmethod