Incentive Schemes for Centralized Material Planning and Allocation With Asymmetric Information in Construction Supply Chain
In construction projects, a centralized management mode can effectively address the material management issues. Specifically, the Material Management Department (MMD) is responsible for material purchase, storage, and allocation based on the demand information reported by contractors. However, mater...
Saved in:
| Main Authors: | Hui Lu, Hongwei Wang, Chao Qi, Yong Xie, Dian Liu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
IEEE
2025-01-01
|
| Series: | IEEE Access |
| Subjects: | |
| Online Access: | https://ieeexplore.ieee.org/document/9139984/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction of Information Sharing Incentive Model of Food Supply and Demand Network Based on Cross-chain
by: HE Jing, et al.
Published: (2024-11-01) -
System Dynamics Model of Closed-loop Supply Chain Dominated by Retailers under Manufacturer’s Incentive Strategy
by: MIAO Shi-di, et al.
Published: (2017-12-01) -
Dynamic Incentive Mechanism of Collaboration in Prefabricated Building Supply Chain Based on Differential Game
by: Junwu Wang, et al.
Published: (2024-10-01) -
Future research of supply chain resilience: Network perspectives and incorporation of more stakeholders
by: L. Jeff Hong, et al.
Published: (2025-03-01) -
CSR Input and Recycling Decisions for Closed-Loop Supply Chain with Asymmetric Demand Information
by: Minghui Ni, et al.
Published: (2025-06-01)