Bearing Repair and Monitoring for Poyanghu Cable-Stayed Bridge
Currently, the bearings of Poyanghu Bridge, a 636-meter long cable-stayed bridge, have been damaged. According to numerical analyses, the mechanical state of the damaged bridge unfavorably deviates from the ideal design state, and the bridge should be repaired in time to restore its safety and servi...
Saved in:
Main Authors: | X. X. Cheng, F. B. Ma, J. Q. Chen, B. Dong, G. Wu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8819360 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Vortex-Induced Vibration of a Cable-Stayed Bridge
by: M. T. Song, et al.
Published: (2016-01-01) -
Seismic Passive Control of Cable-Stayed Bridges
by: Hosam-Eddin M. Ali, et al.
Published: (1995-01-01) -
Stayed-Cable Bridge Damage Detection and Localization Based on Accelerometer Health Monitoring Measurements
by: Mosbeh R. Kaloop, et al.
Published: (2015-01-01) -
Replacement of Cable Stays in Yonghe Bridge in Tianjin, China
by: Hongjiang Li
Published: (2020-01-01) -
Cable Force Measurement of Cable-Stayed Bridge Based on Microwave Radar Test Technology
by: Gongjian Che, et al.
Published: (2024-01-01)