Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3

Stress tests performed in Europe after accident at Fukushima Daiichi also required evaluation of the consequences of loss of safety functions due to station blackout (SBO). Long-term SBO in a pressurized water reactor (PWR) leads to severe accident sequences, assuming that existing plant means (syst...

Full description

Saved in:
Bibliographic Details
Main Authors: Andrej Prošek, Leon Cizelj
Format: Article
Language:English
Published: Wiley 2013-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2013/851987
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832568076553420800
author Andrej Prošek
Leon Cizelj
author_facet Andrej Prošek
Leon Cizelj
author_sort Andrej Prošek
collection DOAJ
description Stress tests performed in Europe after accident at Fukushima Daiichi also required evaluation of the consequences of loss of safety functions due to station blackout (SBO). Long-term SBO in a pressurized water reactor (PWR) leads to severe accident sequences, assuming that existing plant means (systems, equipment, and procedures) are used for accident mitigation. Therefore the main objective was to study the accident management strategies for SBO scenarios (with different reactor coolant pumps (RCPs) leaks assumed) to delay the time before core uncovers and significantly heats up. The most important strategies assumed were primary side depressurization and additional makeup water to reactor coolant system (RCS). For simulations of long term SBO scenarios, including early stages of severe accident sequences, the best estimate RELAP5/MOD3.3 and the verified input model of Krško two-loop PWR were used. The results suggest that for the expected magnitude of RCPs seal leak, the core uncovery during the first seven days could be prevented by using the turbine-driven auxiliary feedwater pump and manually depressurizing the RCS through the secondary side. For larger RCPs seal leaks, in general this is not the case. Nevertheless, the core uncovery can be significantly delayed by increasing RCS depressurization.
format Article
id doaj-art-555729affae04ff08e18fb0e1f8bf0ee
institution Kabale University
issn 1687-6075
1687-6083
language English
publishDate 2013-01-01
publisher Wiley
record_format Article
series Science and Technology of Nuclear Installations
spelling doaj-art-555729affae04ff08e18fb0e1f8bf0ee2025-02-03T00:59:51ZengWileyScience and Technology of Nuclear Installations1687-60751687-60832013-01-01201310.1155/2013/851987851987Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3Andrej Prošek0Leon Cizelj1Jožef Stefan Institute, Jamova Cesta 39, 1000 Ljubljana, SloveniaJožef Stefan Institute, Jamova Cesta 39, 1000 Ljubljana, SloveniaStress tests performed in Europe after accident at Fukushima Daiichi also required evaluation of the consequences of loss of safety functions due to station blackout (SBO). Long-term SBO in a pressurized water reactor (PWR) leads to severe accident sequences, assuming that existing plant means (systems, equipment, and procedures) are used for accident mitigation. Therefore the main objective was to study the accident management strategies for SBO scenarios (with different reactor coolant pumps (RCPs) leaks assumed) to delay the time before core uncovers and significantly heats up. The most important strategies assumed were primary side depressurization and additional makeup water to reactor coolant system (RCS). For simulations of long term SBO scenarios, including early stages of severe accident sequences, the best estimate RELAP5/MOD3.3 and the verified input model of Krško two-loop PWR were used. The results suggest that for the expected magnitude of RCPs seal leak, the core uncovery during the first seven days could be prevented by using the turbine-driven auxiliary feedwater pump and manually depressurizing the RCS through the secondary side. For larger RCPs seal leaks, in general this is not the case. Nevertheless, the core uncovery can be significantly delayed by increasing RCS depressurization.http://dx.doi.org/10.1155/2013/851987
spellingShingle Andrej Prošek
Leon Cizelj
Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
Science and Technology of Nuclear Installations
title Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
title_full Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
title_fullStr Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
title_full_unstemmed Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
title_short Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3
title_sort long term station blackout accident analyses of a pwr with relap5 mod3 3
url http://dx.doi.org/10.1155/2013/851987
work_keys_str_mv AT andrejprosek longtermstationblackoutaccidentanalysesofapwrwithrelap5mod33
AT leoncizelj longtermstationblackoutaccidentanalysesofapwrwithrelap5mod33