Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy
A multiperiod generation and transmission expansion planning (G&TEP) problem is considered. This model integrates conventional generation with renewable energy sources, assuming a stochastic approach. The proposed approach is based on a centralized planned transmission expansion. Due to the worl...
Saved in:
Main Authors: | Lourdes Martínez-Villaseñor, Hiram Ponce, José Antonio Marmolejo-Saucedo, Juan Manuel Ramírez, Agustina Hernández |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2018/1438196 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A concise review on sensor signal acquisition and transformation applied to human activity recognition and human–robot interaction
by: Lourdes Martínez-Villaseñor, et al.
Published: (2019-06-01) -
A Reliable Approach for Solving Transmission Network Expansion Planning with Objective of Planning Cost Reduction
by: Yongqiu Liu
Published: (2022-04-01) -
Trade-off between computation time and solution quality for integrated generation and transmission expansion planning with N-1 security criterion
by: Lucas Y. Okamura, et al.
Published: (2025-03-01) -
Editorial
by: Hiram Ponce, et al.
Published: (2021-02-01) -
Optimizing a Biobjective Production-Distribution Planning Problem Using a GRASP
by: Martha-Selene Casas-Ramírez, et al.
Published: (2018-01-01)