Simulation of the Operation of a Borehole Groundwater Intake with an Annular Prefabricated Conduit

Among the considered options for schemes of prefabricated water conduits of borehole water intakes, the main ones are linear and ring schemes. The article presents a comparative analysis of the linear and ring schemes for the placement of prefabricated water conduits when choosing an option for desi...

Full description

Saved in:
Bibliographic Details
Main Authors: V. V. Veremenyuk, V. V. Ivashechkin, V. I. Krytskaya
Format: Article
Language:Russian
Published: Belarusian National Technical University 2023-06-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Subjects:
Online Access:https://energy.bntu.by/jour/article/view/2272
Tags: Add Tag
No Tags, Be the first to tag this record!