Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
On August 29 and 30, 2012, local extreme rainfalls struck the construction area of the Jinping I Hydropower Station, Xichang, China, and triggered many geohazards. The upper region of the left valley slope 200 m downstream of the dam failed and slid, exposing the D-pile of the G1002 electricity pylo...
Saved in:
Main Authors: | Gang Luo, Yutian Zhong, Yuanxiang Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8820315 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental Study on Deformation Monitoring of Large Landslide in Reservoir Area of Hydropower Station Based on GB-InSAR
by: Yanhui Guo, et al.
Published: (2021-01-01) -
Stability Monitoring and Analysis of High and Steep Slope of a Hydropower Station
by: Guangcheng Shi, et al.
Published: (2020-01-01) -
Path Transmissibility Analysis Considering Two Types of Correlations in Hydropower Stations
by: Baoping Zhi, et al.
Published: (2013-01-01) -
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
by: Changjun Wang, et al.
Published: (2019-01-01) -
Effect of Cavitation with Vibration on the Powerhouse Structure of Bulb Turbines Installed in Hydropower Stations
by: Praveen S, et al.
Published: (2022-01-01)