Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station

On August 29 and 30, 2012, local extreme rainfalls struck the construction area of the Jinping I Hydropower Station, Xichang, China, and triggered many geohazards. The upper region of the left valley slope 200 m downstream of the dam failed and slid, exposing the D-pile of the G1002 electricity pylo...

Full description

Saved in:
Bibliographic Details
Main Authors: Gang Luo, Yutian Zhong, Yuanxiang Yang
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2020/8820315
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832567303558922240
author Gang Luo
Yutian Zhong
Yuanxiang Yang
author_facet Gang Luo
Yutian Zhong
Yuanxiang Yang
author_sort Gang Luo
collection DOAJ
description On August 29 and 30, 2012, local extreme rainfalls struck the construction area of the Jinping I Hydropower Station, Xichang, China, and triggered many geohazards. The upper region of the left valley slope 200 m downstream of the dam failed and slid, exposing the D-pile of the G1002 electricity pylon and threatening the entire power transmission line. Therefore, guaranteeing the stability of the residual soil masses in the rear area of the main scarp and the safety of the G1002 electricity pylon became a primary emergency task. Geological field surveys, topographical mapping, study of the failure mechanisms, and stability evaluations were carried out from October 12, 2012, to November 7, 2013. It is revealed that the failure mechanism of the G1002 electricity pylon landslide is flood-induced tractive sliding along the interlayer between the colluvium and the bedrock, significantly influenced by heavy precipitation and frequent blasting activities during the dam construction. The residual soil masses around the G1002 electricity pylon foundation are unstable under rainfall conditions. In order to ensure the stability of the residual soil masses and pylon foundation, a mitigation measure of the anchor cables combined with lattice frame beams was proposed and applied in practice. This paper provides insights into the problems associated with the selection of the locations of electricity pylons in ravine regions as well as mitigation strategies for similar landslides.
format Article
id doaj-art-497113861a584e66aba3f5985467e6dd
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-497113861a584e66aba3f5985467e6dd2025-02-03T01:01:54ZengWileyAdvances in Civil Engineering1687-80861687-80942020-01-01202010.1155/2020/88203158820315Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower StationGang Luo0Yutian Zhong1Yuanxiang Yang2Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 610031, ChinaFaculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 610031, ChinaFaculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 610031, ChinaOn August 29 and 30, 2012, local extreme rainfalls struck the construction area of the Jinping I Hydropower Station, Xichang, China, and triggered many geohazards. The upper region of the left valley slope 200 m downstream of the dam failed and slid, exposing the D-pile of the G1002 electricity pylon and threatening the entire power transmission line. Therefore, guaranteeing the stability of the residual soil masses in the rear area of the main scarp and the safety of the G1002 electricity pylon became a primary emergency task. Geological field surveys, topographical mapping, study of the failure mechanisms, and stability evaluations were carried out from October 12, 2012, to November 7, 2013. It is revealed that the failure mechanism of the G1002 electricity pylon landslide is flood-induced tractive sliding along the interlayer between the colluvium and the bedrock, significantly influenced by heavy precipitation and frequent blasting activities during the dam construction. The residual soil masses around the G1002 electricity pylon foundation are unstable under rainfall conditions. In order to ensure the stability of the residual soil masses and pylon foundation, a mitigation measure of the anchor cables combined with lattice frame beams was proposed and applied in practice. This paper provides insights into the problems associated with the selection of the locations of electricity pylons in ravine regions as well as mitigation strategies for similar landslides.http://dx.doi.org/10.1155/2020/8820315
spellingShingle Gang Luo
Yutian Zhong
Yuanxiang Yang
Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
Advances in Civil Engineering
title Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
title_full Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
title_fullStr Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
title_full_unstemmed Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
title_short Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
title_sort failure mechanism and mitigation measures of the g1002 electricity pylon landslide at the jinping i hydropower station
url http://dx.doi.org/10.1155/2020/8820315
work_keys_str_mv AT gangluo failuremechanismandmitigationmeasuresoftheg1002electricitypylonlandslideatthejinpingihydropowerstation
AT yutianzhong failuremechanismandmitigationmeasuresoftheg1002electricitypylonlandslideatthejinpingihydropowerstation
AT yuanxiangyang failuremechanismandmitigationmeasuresoftheg1002electricitypylonlandslideatthejinpingihydropowerstation