Long-Term Multiyear Transmission Expansion Planning in Turkish Power System
To sustain the clean energy transition without interruption and to ensure the reliable operation of the transmission system, it is required to have enough additional transmission capacity in the future horizons. The transmission expansion planning (TEP) problem is a core issue in deciding additional...
Saved in:
| Main Authors: | Ahmet Ova, Erdi Dogan, Sevki Demirbas |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2024-01-01
|
| Series: | International Transactions on Electrical Energy Systems |
| Online Access: | http://dx.doi.org/10.1155/2024/9028785 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Average Power-Based Planning Framework of Transmission Expansion: A New Role for Energy Storage
by: Qian Zhang, et al.
Published: (2025-01-01) -
Growing the power system: Expansions on transmission and distribution systems for deep electrification
by: Jessie Ma
Published: (2025-06-01) -
Improved Binary Differential Evolution for Transmission Expansion Planning
by: Somchit Siripat, et al.
Published: (2025-01-01) -
Transmission Network Expansion Planning Considering Phase-Shifter Transformers
by: Celso T. Miasaki, et al.
Published: (2012-01-01) -
Resilience-oriented Transmission Expansion Planning with Optimal Transmission Switching Under Typhoon Weather
by: Yang Yuan, et al.
Published: (2024-01-01)