Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures

For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel st...

Full description

Saved in:
Bibliographic Details
Main Authors: Wang Yao, Zhang Hao, Zhang Feng, Li Yang, Li Dong, Bao Min
Format: Article
Language:English
Published: Wiley 2024-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2024/1668290
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832559549518708736
author Wang Yao
Zhang Hao
Zhang Feng
Li Yang
Li Dong
Bao Min
author_facet Wang Yao
Zhang Hao
Zhang Feng
Li Yang
Li Dong
Bao Min
author_sort Wang Yao
collection DOAJ
description For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel structures. The main steps of the process involve the construction of the main truss first. After the main truss construction is completed, it is lowered to a certain position within its elastic range using cables. The roof grid is then connected to the main truss. Once all connections are completed, the cable tension is gradually released. After the cable tension is released, the main truss exhibits a certain degree of rebound. During the rebound process, the roof grid forms a prestressed structure, ensuring stability and integrity between the main truss and the roof. Through numerical simulation, process analysis is conducted on this construction process, and the optimal construction scheme is proposed.
format Article
id doaj-art-3fd98c8c464f4684aa14c8be6f7d8516
institution Kabale University
issn 1687-8094
language English
publishDate 2024-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-3fd98c8c464f4684aa14c8be6f7d85162025-02-03T01:29:49ZengWileyAdvances in Civil Engineering1687-80942024-01-01202410.1155/2024/1668290Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof StructuresWang Yao0Zhang Hao1Zhang Feng2Li Yang3Li Dong4Bao Min5Strait Construction and Development Co., Ltd.Strait Construction and Development Co., Ltd.Strait Construction and Development Co., Ltd.Strait Construction and Development Co., Ltd.College of Civil Engineering of Fuzhou UniversityBeijing Construction Engineering Research Institute Co., Ltd.For medium and small-scale steel structure stadiums, in order to minimize the impact of the construction process on the structural state, a prestressing construction process tailored to medium and small stadiums is proposed, taking full advantage of the inherent elastic deformation range of steel structures. The main steps of the process involve the construction of the main truss first. After the main truss construction is completed, it is lowered to a certain position within its elastic range using cables. The roof grid is then connected to the main truss. Once all connections are completed, the cable tension is gradually released. After the cable tension is released, the main truss exhibits a certain degree of rebound. During the rebound process, the roof grid forms a prestressed structure, ensuring stability and integrity between the main truss and the roof. Through numerical simulation, process analysis is conducted on this construction process, and the optimal construction scheme is proposed.http://dx.doi.org/10.1155/2024/1668290
spellingShingle Wang Yao
Zhang Hao
Zhang Feng
Li Yang
Li Dong
Bao Min
Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
Advances in Civil Engineering
title Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
title_full Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
title_fullStr Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
title_full_unstemmed Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
title_short Construction Method and Process Optimization of Prestress Reverse Tensioning for Large-Span Bidirectional Suspension Steel Roof Structures
title_sort construction method and process optimization of prestress reverse tensioning for large span bidirectional suspension steel roof structures
url http://dx.doi.org/10.1155/2024/1668290
work_keys_str_mv AT wangyao constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures
AT zhanghao constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures
AT zhangfeng constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures
AT liyang constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures
AT lidong constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures
AT baomin constructionmethodandprocessoptimizationofprestressreversetensioningforlargespanbidirectionalsuspensionsteelroofstructures