Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat

Rivers that flow from hilly or mountainous areas can be used for various purposes including; sources of drinking water, irrigation, fisheries, power plants, and downstream shipping lanes. West Sumatra Province is mostly a mountainous area and has many rivers flowing east and west from the Barisan hi...

Full description

Saved in:
Bibliographic Details
Main Authors: Februarman Februarman, Hendri Hardiyanto, Muhamad Shubhi Nurul Hadie
Format: Article
Language:English
Published: Jurusan Teknik Sipil, Fakultas Teknik, Universitas Andalas 2023-12-01
Series:Jurnal Bangunan, Konstruksi & Desain
Subjects:
Online Access:https://jbkd.ft.unand.ac.id/index.php/jbkd/article/view/27
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832594063549792256
author Februarman Februarman
Hendri Hardiyanto
Muhamad Shubhi Nurul Hadie
author_facet Februarman Februarman
Hendri Hardiyanto
Muhamad Shubhi Nurul Hadie
author_sort Februarman Februarman
collection DOAJ
description Rivers that flow from hilly or mountainous areas can be used for various purposes including; sources of drinking water, irrigation, fisheries, power plants, and downstream shipping lanes. West Sumatra Province is mostly a mountainous area and has many rivers flowing east and west from the Barisan hills. This condition allows the development of hydroelectric power plants that utilize the head and discharge of rivers. One potential development of a mini hydro power plant (PLTM)  is in Batang Panggang, which is located  in Paraman Ampalu Village, Gunung Tuleh District, West Pasaman Regency. The potential for developing a PLTM on the Batang Panggang River is based on topographic conditions that allow for adequate head height and river flow that can produce electrical energy. For this reason, it is necessary to study the potential by selecting the planned discharge so that it can produce several power production values. These various power productions can be taken into consideration in relation to development costs and operating patterns agreed with PT. PLN (Persero). In this study, the data used includes daily discharge data from automatic water level record (AWLR) recording over the last 15 years. From the discharge data, a Flow Duration Curve (FDC) can be drawn to determine the relationship between discharge and the probability of its occurrence, and this is used as a basis for selecting generator discharge plans and annual energy production. Based on the topographic conditions of the location, the elevation of the lighthouse weir is planned at an altitude of +200 m above sea level, the calming tank is at an altitude of +197 m and the location of the power house is at an altitude of +150 m, while the length of the carrier channel is 2400 m. From this elevation, the height of the fall, H, is 50 m. Assuming the effective fall height, Heff  is 90%xH, then Heff is obtained as 45 m. By trying the planned discharge used is Q40% to Q80%, from the FDC we get Q40% = 17.97 m3/s, Q50% = 14.99 m3/s, Q60% = 12.98 m3/s, Q70% = 11.17 m3/s, and Q80% =   9.54 m3/s. Based on the fall height and design discharge, the appropriate type of turbine is a French turbine and the generator efficiency is 0.95, then the annual  energy for each Qplan is obtained, namely; W40 = 40413.97 MWh, W50 = 37108.22 MWh, W60 = 34744.17 MWh, W70 = 31296.90 MWh, and W80 = 27606.57 MWh.
format Article
id doaj-art-3e585f826f934db498f64818b10e1752
institution Kabale University
issn 3021-7547
language English
publishDate 2023-12-01
publisher Jurusan Teknik Sipil, Fakultas Teknik, Universitas Andalas
record_format Article
series Jurnal Bangunan, Konstruksi & Desain
spelling doaj-art-3e585f826f934db498f64818b10e17522025-01-20T05:26:22ZengJurusan Teknik Sipil, Fakultas Teknik, Universitas AndalasJurnal Bangunan, Konstruksi & Desain3021-75472023-12-011312313210.25077/jbkd.1.3.123-132.202327Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman BaratFebruarman Februarman0Hendri Hardiyanto1Muhamad Shubhi Nurul Hadie2Universitas AndalasUniversitas AndalasUniversitas AndalasRivers that flow from hilly or mountainous areas can be used for various purposes including; sources of drinking water, irrigation, fisheries, power plants, and downstream shipping lanes. West Sumatra Province is mostly a mountainous area and has many rivers flowing east and west from the Barisan hills. This condition allows the development of hydroelectric power plants that utilize the head and discharge of rivers. One potential development of a mini hydro power plant (PLTM)  is in Batang Panggang, which is located  in Paraman Ampalu Village, Gunung Tuleh District, West Pasaman Regency. The potential for developing a PLTM on the Batang Panggang River is based on topographic conditions that allow for adequate head height and river flow that can produce electrical energy. For this reason, it is necessary to study the potential by selecting the planned discharge so that it can produce several power production values. These various power productions can be taken into consideration in relation to development costs and operating patterns agreed with PT. PLN (Persero). In this study, the data used includes daily discharge data from automatic water level record (AWLR) recording over the last 15 years. From the discharge data, a Flow Duration Curve (FDC) can be drawn to determine the relationship between discharge and the probability of its occurrence, and this is used as a basis for selecting generator discharge plans and annual energy production. Based on the topographic conditions of the location, the elevation of the lighthouse weir is planned at an altitude of +200 m above sea level, the calming tank is at an altitude of +197 m and the location of the power house is at an altitude of +150 m, while the length of the carrier channel is 2400 m. From this elevation, the height of the fall, H, is 50 m. Assuming the effective fall height, Heff  is 90%xH, then Heff is obtained as 45 m. By trying the planned discharge used is Q40% to Q80%, from the FDC we get Q40% = 17.97 m3/s, Q50% = 14.99 m3/s, Q60% = 12.98 m3/s, Q70% = 11.17 m3/s, and Q80% =   9.54 m3/s. Based on the fall height and design discharge, the appropriate type of turbine is a French turbine and the generator efficiency is 0.95, then the annual  energy for each Qplan is obtained, namely; W40 = 40413.97 MWh, W50 = 37108.22 MWh, W60 = 34744.17 MWh, W70 = 31296.90 MWh, and W80 = 27606.57 MWh.https://jbkd.ft.unand.ac.id/index.php/jbkd/article/view/27pltmdebit rencanaenergi listrik
spellingShingle Februarman Februarman
Hendri Hardiyanto
Muhamad Shubhi Nurul Hadie
Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
Jurnal Bangunan, Konstruksi & Desain
pltm
debit rencana
energi listrik
title Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
title_full Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
title_fullStr Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
title_full_unstemmed Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
title_short Potensi Pembangunan Pembangkit Tenaga Mini Hidro (PLTM) pada Sungai Batang Kenaikan Kabupaten Pasaman Barat
title_sort potensi pembangunan pembangkit tenaga mini hidro pltm pada sungai batang kenaikan kabupaten pasaman barat
topic pltm
debit rencana
energi listrik
url https://jbkd.ft.unand.ac.id/index.php/jbkd/article/view/27
work_keys_str_mv AT februarmanfebruarman potensipembangunanpembangkittenagaminihidropltmpadasungaibatangkenaikankabupatenpasamanbarat
AT hendrihardiyanto potensipembangunanpembangkittenagaminihidropltmpadasungaibatangkenaikankabupatenpasamanbarat
AT muhamadshubhinurulhadie potensipembangunanpembangkittenagaminihidropltmpadasungaibatangkenaikankabupatenpasamanbarat