Life Cycle Analysis of a Steel Railway Bridge over the Operational Period considering Different Maintenance Scenarios: Application to a Case Study
In the context of bridge management, three main types of maintenance actions can be considered. Maintenance actions can be taken preventively before the predefined limit condition is reached, or as a corrective measure in case those limits have been reached. The third possibility corresponds to the...
Saved in:
Main Authors: | João N. D. Fernandes, José C. Matos, Hélder S. Sousa, Mário R. F. Coelho |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/3010001 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Steel-Concrete Composite Bridges: Design, Life Cycle Assessment, Maintenance, and Decision-Making
by: D. Martínez-Muñoz, et al.
Published: (2020-01-01) -
Experimental Analysis of Static and Dynamic Performance for Continuous Warren Truss Steel Railway Bridge in Heavy Haul Railway
by: Yiqiang Li, et al.
Published: (2024-01-01) -
Life-Cycle Management Strategy on Steel Girders in Bridges
by: Kevin K. L. So, et al.
Published: (2012-01-01) -
Binge Eating Behavior and Weight Loss Maintenance over a 2-Year Period
by: Carly R. Pacanowski, et al.
Published: (2014-01-01) -
Multistrategy Cooperation Particle Swarm Optimization for FEM Model Update of the Continuous Warren Truss Steel Railway Bridge
by: Yiqiang Li, et al.
Published: (2023-01-01)