Life Cycle Risk Assessment of Urban Rail Equipment Based on Reliability Analysis
[Objective] The high reliability of urban rail transit system equipment is the cornerstone and guarantee for maintaining the safe and stable operation. Due to the rapid increase in operating mileage and the continuous expansion of network line capacity in recent years, the operational risks of urban...
Saved in:
| Main Authors: | WANG Junzhe, ZHU Lin, LIU Zhigang, TAO Yijun, HUANG Yuanchun |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-04-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.012.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
by: WANG Xin
Published: (2024-11-01) -
Development Prospect of High-reliability Urban Rail Transit Permanent Magnet Traction System Based on Digital Twin Technology
by: ZHOU Chengyao, et al.
Published: (2025-03-01) -
Identifying Station Importance in Urban Rail Transit Networks Using a Combination of Centrality and Time Reliability Measures: A Case Study in Beijing, China
by: Xiaohan Xu, et al.
Published: (2024-05-01) -
Research on Speed Limit Protection System of Urban Rail Transit Engineering Equipment
by: Jianing DAI, et al.
Published: (2020-03-01) -
Comparative lifecycle cost and sustainability assessments between very-light rail and bus-rapid transit
by: David Boateng Yeboah, et al.
Published: (2025-07-01)