Corrigendum to “A Novel MILP Model for the Production, Lot Sizing, and Scheduling of Automotive Plastic Components on Parallel Flexible Injection Machines with Setup Common Operators”
Saved in:
Main Authors: | Beatriz Andres, Eduardo Guzman, Raul Poler |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2021/9850964 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
by: Shiming Yang, et al.
Published: (2025-01-01) -
Presenting a model for solving lot-streaming hybrid flow shop scheduling problem by considering independent setup time and transportation time
by: Roja Ruhbakhsh, et al.
Published: (2023-09-01) -
CLAMPING DIES DESIGN TO MINIMIZE AUTOMOTIVE COMPONENT DIES SETUP TIME AT PT GANDING TOOLSINDO
by: Sanurya Putri Purbaningrum, et al.
Published: (2024-07-01) -
Vision-based manipulation of transparent plastic bags in industrial setups
by: F. Adetunji, et al.
Published: (2025-01-01) -
Corrigendum to “Improved Combinatorial Benders Decomposition for a Scheduling Problem with Unrelated Parallel Machines”
by: Francisco Regis Abreu Gomes, et al.
Published: (2017-01-01)