Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
The main challenge for metro station construction is to ensure the construction schedule while minimizing the impact on the surrounding environment. Based on the characteristics of the upper-soft and lower-hard stratum in the Dalian city of China, a special structure with six pilot tunnels and three...
Saved in:
Main Authors: | Xinping Guo, Annan Jiang, Shanyong Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6615016 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Influence of Pile-Beam-Arch Construction on the Stratum and Station Support Structure
by: Nan Liu, et al.
Published: (2023-01-01) -
A Study on Excavation Characteristics of Tunnel with Upper-Soft Lower-Hard Stratum
by: Jun Feng, et al.
Published: (2022-01-01) -
Research on Disaster-Control Method of Metro Station in Soft Fluid-Plastic Stratum
by: Wang Hongbo, et al.
Published: (2019-01-01) -
Tunnel face stability in strata rich in water with soft upper and hard lower layers
by: Tao Zhan, et al.
Published: (2025-02-01) -
Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
by: Yong-ping Guan, et al.
Published: (2014-01-01)