A Combined Method for Predicting the Boron Deposited Mass and the CIPS Risk
CIPS is a shift in the axial power towards the bottom half of the core, also known as axial offset anomaly (AOA), which results from the deposited of corrosion products during an operation. The main reason of CIPS is the solute particles especially boron compounds concentrated inside the porous depo...
Saved in:
Main Authors: | Shengzhe Li, Dongmei Yang, Tengfei Zhang, Xiaojing Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2019/9537421 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
CIP Method of Characteristics for the Solution of Tide Wave Equations
by: Yafei Nie, et al.
Published: (2018-01-01) -
Ukrainian adaptation of the Clance Impostor Phenomenon Scale (CIPS)
by: T. Yablonska, et al.
Published: (2024-09-01) -
Numerical Study of Violent Impact Flow Using a CIP-Based Model
by: Qiao-ling Ji, et al.
Published: (2013-01-01) -
CIP: an alternative career guidance model to improve self-understanding and work understanding for deaf students
by: Endang Pudjiastuti Sartinah, et al.
Published: (2023-06-01) -
Investigation of Boron Thermal Diffusion from Atmospheric Pressure Chemical Vapor Deposited Boron Silicate Glass for N-Type Solar Cell Process Application
by: Ikuo Kurachi, et al.
Published: (2016-01-01)