RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO

Background: PT PAL Indonesia (Persero) operates Overhead Crane Double Girder tool everyday. The operation of the device have some risk of material hazard, material pinched, material scratched, fracture and passed away. Purpose: The purpose of this research was to assess the level of risk of occupati...

Full description

Saved in:
Bibliographic Details
Main Authors: Lenny Novita, Erwin Dyah Nawawinetu
Format: Article
Language:English
Published: Universitas Airlangga 2018-11-01
Series:Journal of Vocational Health Studies
Subjects:
Online Access:https://e-journal.unair.ac.id/JVHS/article/view/10352
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832568831809159168
author Lenny Novita
Erwin Dyah Nawawinetu
author_facet Lenny Novita
Erwin Dyah Nawawinetu
author_sort Lenny Novita
collection DOAJ
description Background: PT PAL Indonesia (Persero) operates Overhead Crane Double Girder tool everyday. The operation of the device have some risk of material hazard, material pinched, material scratched, fracture and passed away. Purpose: The purpose of this research was to assess the level of risk of occupational injury on the operation of Overhead Crane Double Girder. Methods: This research was a descriptive observational one. This study focuses on the operation of Overhead Crane Double Girder in the Kapal Niaga division PT PAL Indonesia (Persero) which consist of the preparation and operation phase. Result: The initial risk level categorized as high-risk level of 44% and a moderate risk level of 56%. The most frequently prevention measure ware routine check, compliance of SOP and PPE usage on workers. Implementation of control efforts resulted in a moderate risk rate of 44% and a low risk level of 56%. Conclusion: Recommendation of control for PT PAL Indonesia (Persero) performs routine maintenance both on equipment and overhead crane function double girder, application and compliance of operating SOP, and operator must have driving license of overhead crane double girder and experience in the field, if applied properly then final risk level to be 100% low.
format Article
id doaj-art-33d4d63a09494121b7edfba89ae3c6ea
institution Kabale University
issn 2580-7161
2580-717X
language English
publishDate 2018-11-01
publisher Universitas Airlangga
record_format Article
series Journal of Vocational Health Studies
spelling doaj-art-33d4d63a09494121b7edfba89ae3c6ea2025-02-03T00:01:14ZengUniversitas AirlanggaJournal of Vocational Health Studies2580-71612580-717X2018-11-01211710.20473/jvhs.V2.I1.2018.1-75169RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSEROLenny Novita0Erwin Dyah Nawawinetu1Student of Occupational Health and Safety, Faculty of Vocational Studies, Universitas Airlangga, Surabaya-IndonesiaDepartment of Health, Faculty of Vocational Education, Universitas Airlangga, Surabaya-IndonesiaBackground: PT PAL Indonesia (Persero) operates Overhead Crane Double Girder tool everyday. The operation of the device have some risk of material hazard, material pinched, material scratched, fracture and passed away. Purpose: The purpose of this research was to assess the level of risk of occupational injury on the operation of Overhead Crane Double Girder. Methods: This research was a descriptive observational one. This study focuses on the operation of Overhead Crane Double Girder in the Kapal Niaga division PT PAL Indonesia (Persero) which consist of the preparation and operation phase. Result: The initial risk level categorized as high-risk level of 44% and a moderate risk level of 56%. The most frequently prevention measure ware routine check, compliance of SOP and PPE usage on workers. Implementation of control efforts resulted in a moderate risk rate of 44% and a low risk level of 56%. Conclusion: Recommendation of control for PT PAL Indonesia (Persero) performs routine maintenance both on equipment and overhead crane function double girder, application and compliance of operating SOP, and operator must have driving license of overhead crane double girder and experience in the field, if applied properly then final risk level to be 100% low.https://e-journal.unair.ac.id/JVHS/article/view/10352risk assessmentoverhead crane double girderlevel of risk
spellingShingle Lenny Novita
Erwin Dyah Nawawinetu
RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
Journal of Vocational Health Studies
risk assessment
overhead crane double girder
level of risk
title RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
title_full RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
title_fullStr RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
title_full_unstemmed RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
title_short RISK ASSESSMENT OF OVERHEAD CRANE (OHC) DOUBLE GIRDER OPERATION IN THE KAPAL NIAGA DIVISION IN PT PAL INDONESIA (PERSERO
title_sort risk assessment of overhead crane ohc double girder operation in the kapal niaga division in pt pal indonesia persero
topic risk assessment
overhead crane double girder
level of risk
url https://e-journal.unair.ac.id/JVHS/article/view/10352
work_keys_str_mv AT lennynovita riskassessmentofoverheadcraneohcdoublegirderoperationinthekapalniagadivisioninptpalindonesiapersero
AT erwindyahnawawinetu riskassessmentofoverheadcraneohcdoublegirderoperationinthekapalniagadivisioninptpalindonesiapersero