Shuffled Frog Leaping Algorithm for Preemptive Project Scheduling Problems with Resource Vacations Based on Patterson Set
This paper presents a shuffled frog leaping algorithm (SFLA) for the single-mode resource-constrained project scheduling problem where activities can be divided into equant units and interrupted during processing. Each activity consumes 0–3 types of resources which are renewable and temporarily not...
Saved in:
Main Authors: | Yi Han, Ikou Kaku, Jianhu Cai, Yanlai Li, Chao Yang, Lili Deng |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2013-01-01
|
Series: | Journal of Applied Mathematics |
Online Access: | http://dx.doi.org/10.1155/2013/451090 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An Improved Genetic-Shuffled Frog-Leaping Algorithm for Permutation Flowshop Scheduling
by: Peiliang Wu, et al.
Published: (2020-01-01) -
A Leap-Frog Finite Difference Method for Strongly Coupled System from Sweat Transport in Porous Textile Media
by: Qian Zhang, et al.
Published: (2019-01-01) -
Dennis Patterson on Wittgenstein
by: V. V. Ogleznev
Published: (2021-05-01) -
A novel task scheduling approach for dependent non‐preemptive tasks using fuzzy logic
by: Heba E. Hassan, et al.
Published: (2021-05-01) -
Fetus is a possible target of preemptive medicine—from curative endocrinology to preemptive endocrinology—
by: Norimasa Sagawa
Published: (2024-11-01)