Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure
To address the track irregularity at transition zones between subgrade and rigid structures (bridge, tunnel, etc.), some common transition approaches, such as trapezoid subgrade, were adopted in many engineering areas. However, in regard to a mountainous area, the common transition approaches may no...
Saved in:
Main Authors: | Shuanglong Li, Limin Wei, Xiaobin Chen, Qun He |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8885535 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Seismic Dynamic Response of Deep-Buried Tunnel Based on Tectonic Stress
by: Junjie He, et al.
Published: (2022-01-01) -
Research on the Algorithm for Composite Lining of Deep Buried Water Conveyance Tunnel
by: Fei Li, et al.
Published: (2021-01-01) -
Analysis of Surrounding Rock Pressure of Deep Buried Tunnel considering the Influence of Seepage
by: Qingchen Yao, et al.
Published: (2022-01-01) -
Mechanical response of elevated bridge piles to adjacent deep excavation
by: Ping Zhao, et al.
Published: (2025-01-01) -
Three-dimensional discrete element analysis of the excavation face stability of deep-buried shield tunnels
by: Xin Huang, et al.
Published: (2025-02-01)