Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assi...
Saved in:
Main Authors: | Victor Fernandez-Viagas, Jose M. Framinan |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/924120 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01) -
Project Scheduling Heuristics-Based Standard PSO for Task-Resource Assignment in Heterogeneous Grid
by: Ruey-Maw Chen, et al.
Published: (2011-01-01) -
Optimization for Due-Window Assignment Scheduling with Position-Dependent Weights
by: Li-Yan Wang, et al.
Published: (2020-01-01) -
An Improved Integrated Scheduling Algorithm with Process Sequence Time-Selective Strategy
by: Zhen Wang, et al.
Published: (2021-01-01) -
Project Assignments Assessment in the Content-Integrated Language Course: Stages, Forms, and Online Tools
by: S. V. Titova
Published: (2022-02-01)