Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure
In order to study the vibration influence of tunnel drilling and blasting method on the built tunnel with small clear distance, taking the intersection of Zhuhai Dahengqinshan No. 1 tunnel and Zhuji urban rail tunnel as the engineering background, we used ABAQUS finite element software to conduct nu...
Saved in:
| Main Authors: | Haibin Huang, Peng Li, Chuang Wang, Bingxiang Yuan, Minjie Chen, Weimin Feng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/4730936 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below
by: Baofu Duan, et al.
Published: (2019-01-01) -
Study on the Influence of the Blasting of Preceding Tunnel on the Pre-Penetration Surrounding Rock in Succeeding Tunnel with Small Clear Distance
by: Xiankai Bao, et al.
Published: (2022-01-01) -
Influence on Existing Underlying Metro Tunnel Deformation from Small Clear-Distance Rectangular Box Jacking: Monitoring and Simulation
by: Chong Ma, et al.
Published: (2025-07-01) -
Construction Scheme and Influence Analysis of Horizontal Small-Clear-Distance Shield Tunnel
by: Xujie Li, et al.
Published: (2025-06-01) -
Safety Threshold Determination for Blasting Vibration of the Lining in Existing Tunnels under Adjacent Tunnel Blasting
by: Fei Xue, et al.
Published: (2019-01-01)