Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads

Snow removal is a critical security issue for concrete roads, but geothermal methods can be an environmentally friendly and efficient alternative to traditional approaches for snow removal. In order to obtain fully the change rule of the temperature field of the concrete road under geothermal condit...

Full description

Saved in:
Bibliographic Details
Main Authors: Yan Tan, Jun Song, Zhi Chen, Henglin Xiao
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/9977400
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832546860486623232
author Yan Tan
Jun Song
Zhi Chen
Henglin Xiao
author_facet Yan Tan
Jun Song
Zhi Chen
Henglin Xiao
author_sort Yan Tan
collection DOAJ
description Snow removal is a critical security issue for concrete roads, but geothermal methods can be an environmentally friendly and efficient alternative to traditional approaches for snow removal. In order to obtain fully the change rule of the temperature field of the concrete road under geothermal conditions, observe the relationship between temperature rise and time, and better apply the geothermal buried pipe technology to road snow and ice melting, two concrete road models with the dimension of 1 m × 2 m × 0.45 m are made. The model experiments are carried out under the conditions of 0.8 m/s, 0.85 m/s, and 0.9 m/s of pipeline flow velocity, 15 cm and 25 cm of buried pipe depth, and 10 cm and 15 cm of pipe space. The influence of flow velocity, the buried pipe depth, and space on the internal and surface temperature field of concrete road is studied. The results show that, in the flow velocity test, the temperature of the four-layer measuring points shows an upward trend under different flow velocities. With the increase of initial flow velocity, the temperature rise of the first layer measuring points gradually increases. The temperature rise value of the first layer corresponding to 0.9 m/s is 11.66°C, 4.32°C, and 3.13°C higher than 0.8 m/s and 0.85 m/s, respectively; in the buried depth test, the first layer temperature rise at 15 cm is 1.85°C higher than that at 25 cm; in the space test, when the buried pipe space increases from 10 cm to 15 cm, the temperature rise value of the first layer decreases by 1.2°C. From the above three influencing factors experiments, it can be obtained that the temperature rise stage of the first layer measuring points can be divided into the rapid temperature rise stage within 0–2 hours, the temperature rise one with 2 h–6 h, and stable temperature stage after 6 h. Experimental observation shows that road temperature will be higher than 8°C within 1 h–1.2 h, which can eliminate the road icing temperature conditions to ensure that the road does not freeze. After opening the snow melting system for 6 h, the surface temperature of the road tends to be stable, and there is no significant change. In practical application, open the system 1.5 h in advance so that it can prevent road snow and freezing. After opening the system for 6 h or stopping snowfall and rainfall within 6 h, close the system, and the residual temperature stored in the concrete road is used for deicing and snow melting. Ensuring that the road surface temperature is above 0°C, the heating system is turned on intermittently to save energy. The research provides theoretical support for preventing road snow and freezing.
format Article
id doaj-art-2cc2aa835b1c445699e3ffec61be60ef
institution Kabale University
issn 1687-8086
1687-8094
language English
publishDate 2021-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-2cc2aa835b1c445699e3ffec61be60ef2025-02-03T06:46:45ZengWileyAdvances in Civil Engineering1687-80861687-80942021-01-01202110.1155/2021/99774009977400Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete RoadsYan Tan0Jun Song1Zhi Chen2Henglin Xiao3Department of Structural Engineering, School of Civil Architecture and Environment, Hubei University of Technology, Wuhan 430068, ChinaDepartment of Structural Engineering, School of Civil Architecture and Environment, Hubei University of Technology, Wuhan 430068, ChinaDepartment of Structural Engineering, School of Civil Architecture and Environment, Hubei University of Technology, Wuhan 430068, ChinaDepartment of Structural Engineering, School of Civil Architecture and Environment, Hubei University of Technology, Wuhan 430068, ChinaSnow removal is a critical security issue for concrete roads, but geothermal methods can be an environmentally friendly and efficient alternative to traditional approaches for snow removal. In order to obtain fully the change rule of the temperature field of the concrete road under geothermal conditions, observe the relationship between temperature rise and time, and better apply the geothermal buried pipe technology to road snow and ice melting, two concrete road models with the dimension of 1 m × 2 m × 0.45 m are made. The model experiments are carried out under the conditions of 0.8 m/s, 0.85 m/s, and 0.9 m/s of pipeline flow velocity, 15 cm and 25 cm of buried pipe depth, and 10 cm and 15 cm of pipe space. The influence of flow velocity, the buried pipe depth, and space on the internal and surface temperature field of concrete road is studied. The results show that, in the flow velocity test, the temperature of the four-layer measuring points shows an upward trend under different flow velocities. With the increase of initial flow velocity, the temperature rise of the first layer measuring points gradually increases. The temperature rise value of the first layer corresponding to 0.9 m/s is 11.66°C, 4.32°C, and 3.13°C higher than 0.8 m/s and 0.85 m/s, respectively; in the buried depth test, the first layer temperature rise at 15 cm is 1.85°C higher than that at 25 cm; in the space test, when the buried pipe space increases from 10 cm to 15 cm, the temperature rise value of the first layer decreases by 1.2°C. From the above three influencing factors experiments, it can be obtained that the temperature rise stage of the first layer measuring points can be divided into the rapid temperature rise stage within 0–2 hours, the temperature rise one with 2 h–6 h, and stable temperature stage after 6 h. Experimental observation shows that road temperature will be higher than 8°C within 1 h–1.2 h, which can eliminate the road icing temperature conditions to ensure that the road does not freeze. After opening the snow melting system for 6 h, the surface temperature of the road tends to be stable, and there is no significant change. In practical application, open the system 1.5 h in advance so that it can prevent road snow and freezing. After opening the system for 6 h or stopping snowfall and rainfall within 6 h, close the system, and the residual temperature stored in the concrete road is used for deicing and snow melting. Ensuring that the road surface temperature is above 0°C, the heating system is turned on intermittently to save energy. The research provides theoretical support for preventing road snow and freezing.http://dx.doi.org/10.1155/2021/9977400
spellingShingle Yan Tan
Jun Song
Zhi Chen
Henglin Xiao
Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
Advances in Civil Engineering
title Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
title_full Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
title_fullStr Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
title_full_unstemmed Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
title_short Experimental Study on the Influence of Buried Geothermal Pipes on the Temperature Field of Concrete Roads
title_sort experimental study on the influence of buried geothermal pipes on the temperature field of concrete roads
url http://dx.doi.org/10.1155/2021/9977400
work_keys_str_mv AT yantan experimentalstudyontheinfluenceofburiedgeothermalpipesonthetemperaturefieldofconcreteroads
AT junsong experimentalstudyontheinfluenceofburiedgeothermalpipesonthetemperaturefieldofconcreteroads
AT zhichen experimentalstudyontheinfluenceofburiedgeothermalpipesonthetemperaturefieldofconcreteroads
AT henglinxiao experimentalstudyontheinfluenceofburiedgeothermalpipesonthetemperaturefieldofconcreteroads