Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods
In this study, we developed a method for coordinating and optimizing the train connection plans of different lines under the conditions of urban rail transit (URT) network operation. The method allows trains of different lines to form good connections at transfer stations, which can shorten the wait...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Journal of Advanced Transportation |
Online Access: | http://dx.doi.org/10.1155/2022/6431231 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832549014514434048 |
---|---|
author | Ruihua Xu Xuyang Song Feng Zhou Fangsheng Wang |
author_facet | Ruihua Xu Xuyang Song Feng Zhou Fangsheng Wang |
author_sort | Ruihua Xu |
collection | DOAJ |
description | In this study, we developed a method for coordinating and optimizing the train connection plans of different lines under the conditions of urban rail transit (URT) network operation. The method allows trains of different lines to form good connections at transfer stations, which can shorten the waiting time of passengers for transfers and reduce passenger retention. A mathematical model was developed to simulate the interaction between passengers and trains. Two optimization models were developed for the train connection plan of network transfer stations based on different optimization objectives during peak and off-peak hours. Subsequently, a corresponding solution method based on a genetic algorithm and simulation was designed. Finally, the Suzhou URT network was used as a case study, and the passenger flow of the transfer station was simulated and calculated using relevant automatic fare collection (AFC) data. The results indicated that the average waiting time and the number of passengers stranded were reduced using the proposed method. The calculation example demonstrated the effectiveness of the model and algorithm, which can guide the coordinated preparation of a network train connection plan. |
format | Article |
id | doaj-art-2c9146c04d574b1293b4a7dfabfe2a67 |
institution | Kabale University |
issn | 2042-3195 |
language | English |
publishDate | 2022-01-01 |
publisher | Wiley |
record_format | Article |
series | Journal of Advanced Transportation |
spelling | doaj-art-2c9146c04d574b1293b4a7dfabfe2a672025-02-03T06:12:25ZengWileyJournal of Advanced Transportation2042-31952022-01-01202210.1155/2022/6431231Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak PeriodsRuihua Xu0Xuyang Song1Feng Zhou2Fangsheng Wang3The Key Laboratory of Road and Traffic EngineeringThe Key Laboratory of Road and Traffic EngineeringThe Key Laboratory of Road and Traffic EngineeringThe Key Laboratory of Road and Traffic EngineeringIn this study, we developed a method for coordinating and optimizing the train connection plans of different lines under the conditions of urban rail transit (URT) network operation. The method allows trains of different lines to form good connections at transfer stations, which can shorten the waiting time of passengers for transfers and reduce passenger retention. A mathematical model was developed to simulate the interaction between passengers and trains. Two optimization models were developed for the train connection plan of network transfer stations based on different optimization objectives during peak and off-peak hours. Subsequently, a corresponding solution method based on a genetic algorithm and simulation was designed. Finally, the Suzhou URT network was used as a case study, and the passenger flow of the transfer station was simulated and calculated using relevant automatic fare collection (AFC) data. The results indicated that the average waiting time and the number of passengers stranded were reduced using the proposed method. The calculation example demonstrated the effectiveness of the model and algorithm, which can guide the coordinated preparation of a network train connection plan.http://dx.doi.org/10.1155/2022/6431231 |
spellingShingle | Ruihua Xu Xuyang Song Feng Zhou Fangsheng Wang Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods Journal of Advanced Transportation |
title | Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods |
title_full | Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods |
title_fullStr | Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods |
title_full_unstemmed | Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods |
title_short | Synergistic Optimization Method for URT Network Train Connection Scheme in Peak and Off-Peak Periods |
title_sort | synergistic optimization method for urt network train connection scheme in peak and off peak periods |
url | http://dx.doi.org/10.1155/2022/6431231 |
work_keys_str_mv | AT ruihuaxu synergisticoptimizationmethodforurtnetworktrainconnectionschemeinpeakandoffpeakperiods AT xuyangsong synergisticoptimizationmethodforurtnetworktrainconnectionschemeinpeakandoffpeakperiods AT fengzhou synergisticoptimizationmethodforurtnetworktrainconnectionschemeinpeakandoffpeakperiods AT fangshengwang synergisticoptimizationmethodforurtnetworktrainconnectionschemeinpeakandoffpeakperiods |