Analysis on Rock Burst Risks and Prevention of a 54 m-Wide Coal Pillar for Roadway Protection in a Fully Mechanized Top-Coal Caving Face
A case study based on the 401103 fully mechanized caving face in the Hujiahe Coal Mine was carried out in this research to analyze the rock burst risks in a 54 m-wide coal pillar for roadway protection. Influencing factors of rock burst risks on the working face were analyzed. Stress distribution ch...
Saved in:
Main Authors: | Zhihua Li, Ke Yang, Jianshuai Ji, Biao Jiao, Xiaobing Tian |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2021/5584411 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Reasonable Roadway Position of Working Face under Strip Coal Pillar in Rock Burst Mine
by: Hengze Yang, et al.
Published: (2020-01-01) -
Optimization of Barrier Pillar Design in Longwall Mining with Top Coal Caving in Spontaneous Combustion Coal Seam
by: Qiang Fu, et al.
Published: (2021-01-01) -
Overlying strata movement law and rockburst prevention & control for fully mechanized top coal caving face in extra-thick coal seams
by: Hai Rong, et al.
Published: (2025-02-01) -
Mechanism and Evolution Control of Wide Coal Pillar Bursts in Multithick Key Strata
by: Wenhao Guo, et al.
Published: (2021-01-01) -
Study on Reasonable Size of Coal and Rock Pillar in Dynamic Pressure Roadway Segment of Fully Mechanized Face in Deep Shaft
by: Binyang Sun, et al.
Published: (2020-01-01)