Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC

Integrative action process, the integrated coastal zone management (ICZM) has to deal with temporality conflicts in its implementation. It results from phase shift in rhythms and calendars. During an ICZM process, simultaneous long, middle and short term stakes get crossed. Then, it reveals temporal...

Full description

Saved in:
Bibliographic Details
Main Authors: Betty Queffelec, Fabienne Kervarec
Format: Article
Language:fra
Published: Réseau Développement Durable et Territoires Fragiles 2010-09-01
Series:Développement Durable et Territoires
Subjects:
Online Access:https://journals.openedition.org/developpementdurable/8487
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832095456088293376
author Betty Queffelec
Fabienne Kervarec
author_facet Betty Queffelec
Fabienne Kervarec
author_sort Betty Queffelec
collection DOAJ
description Integrative action process, the integrated coastal zone management (ICZM) has to deal with temporality conflicts in its implementation. It results from phase shift in rhythms and calendars. During an ICZM process, simultaneous long, middle and short term stakes get crossed. Then, it reveals temporality conflicts. But ICZM has a real potential to reduce this phenomenon. The ICZM long term framing feature added to its integrative feature, including its temporal dimension, have a potential to deal with those conflicts. However, many fences reduce yet a complete achievement of this potential.
format Article
id doaj-art-2bca443721914636bf49d84d8f690155
institution Kabale University
issn 1772-9971
language fra
publishDate 2010-09-01
publisher Réseau Développement Durable et Territoires Fragiles
record_format Article
series Développement Durable et Territoires
spelling doaj-art-2bca443721914636bf49d84d8f6901552025-02-05T16:35:46ZfraRéseau Développement Durable et Territoires FragilesDéveloppement Durable et Territoires1772-99712010-09-01110.4000/developpementdurable.8487Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZCBetty QueffelecFabienne KervarecIntegrative action process, the integrated coastal zone management (ICZM) has to deal with temporality conflicts in its implementation. It results from phase shift in rhythms and calendars. During an ICZM process, simultaneous long, middle and short term stakes get crossed. Then, it reveals temporality conflicts. But ICZM has a real potential to reduce this phenomenon. The ICZM long term framing feature added to its integrative feature, including its temporal dimension, have a potential to deal with those conflicts. However, many fences reduce yet a complete achievement of this potential.https://journals.openedition.org/developpementdurable/8487stakeholdersconflicttemporalityeconomic actorsintegrated coastal zone management
spellingShingle Betty Queffelec
Fabienne Kervarec
Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
Développement Durable et Territoires
stakeholders
conflict
temporality
economic actors
integrated coastal zone management
title Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
title_full Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
title_fullStr Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
title_full_unstemmed Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
title_short Les conflits de temporalités dans la gestion du littoral à l'épreuve de la GIZC
title_sort les conflits de temporalites dans la gestion du littoral a l epreuve de la gizc
topic stakeholders
conflict
temporality
economic actors
integrated coastal zone management
url https://journals.openedition.org/developpementdurable/8487
work_keys_str_mv AT bettyqueffelec lesconflitsdetemporalitesdanslagestiondulittoralalepreuvedelagizc
AT fabiennekervarec lesconflitsdetemporalitesdanslagestiondulittoralalepreuvedelagizc