Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study
Nowadays, industrial businesses are more aware of the value of machine maintenance, and more especially, the adoption of an effective maintenance strategy. Total Productive Maintenance (TPM), which involves everyday chores involving the entire workforce, increases equipment efficiency, prevents brea...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education,
2023-09-01
|
Series: | International Journal of Research in Industrial Engineering |
Subjects: | |
Online Access: | https://www.riejournal.com/article_180277_99a37ad1b38454755fc6a29e6e83251d.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832577728283410432 |
---|---|
author | Ahsanul Abedin |
author_facet | Ahsanul Abedin |
author_sort | Ahsanul Abedin |
collection | DOAJ |
description | Nowadays, industrial businesses are more aware of the value of machine maintenance, and more especially, the adoption of an effective maintenance strategy. Total Productive Maintenance (TPM), which involves everyday chores involving the entire workforce, increases equipment efficiency, prevents breakdowns, and promotes autonomous operator maintenance. TPM is a fantastic technique for maintaining buildings and machines. This article provides research and a review of TPM implementation in an RMG Industry to help enhance Overall Equipment Effectiveness (OEE). Data from the past have been studied, and the findings obtained in terms of motivated employees, improved OEE, and a decrease in the number of rejects/accidents on the production line are fairly positive. The methodology calls for gradually applying lean principles, Autonomous Maintenance (AM), 5S, and planned maintenance. After TPM deployment on the critical machine, improvements in availability, performance, and quality are seen boosting the overall efficacy of the equipment. A comparison of OEE before and after implementation demonstrates the effectiveness of TPM deployment throughout the industry. |
format | Article |
id | doaj-art-2a7515d5fdc64273a1ed06c08d87997b |
institution | Kabale University |
issn | 2783-1337 2717-2937 |
language | English |
publishDate | 2023-09-01 |
publisher | Ayandegan Institute of Higher Education, |
record_format | Article |
series | International Journal of Research in Industrial Engineering |
spelling | doaj-art-2a7515d5fdc64273a1ed06c08d87997b2025-01-30T15:09:57ZengAyandegan Institute of Higher Education,International Journal of Research in Industrial Engineering2783-13372717-29372023-09-0112320522010.22105/riej.2023.393216.1388180277Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case studyAhsanul Abedin0Khulna University of Engineering and Technology, Khulna9203.Nowadays, industrial businesses are more aware of the value of machine maintenance, and more especially, the adoption of an effective maintenance strategy. Total Productive Maintenance (TPM), which involves everyday chores involving the entire workforce, increases equipment efficiency, prevents breakdowns, and promotes autonomous operator maintenance. TPM is a fantastic technique for maintaining buildings and machines. This article provides research and a review of TPM implementation in an RMG Industry to help enhance Overall Equipment Effectiveness (OEE). Data from the past have been studied, and the findings obtained in terms of motivated employees, improved OEE, and a decrease in the number of rejects/accidents on the production line are fairly positive. The methodology calls for gradually applying lean principles, Autonomous Maintenance (AM), 5S, and planned maintenance. After TPM deployment on the critical machine, improvements in availability, performance, and quality are seen boosting the overall efficacy of the equipment. A comparison of OEE before and after implementation demonstrates the effectiveness of TPM deployment throughout the industry.https://www.riejournal.com/article_180277_99a37ad1b38454755fc6a29e6e83251d.pdfoverall equipment effectivenessrcatotal productive maintenance5s |
spellingShingle | Ahsanul Abedin Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study International Journal of Research in Industrial Engineering overall equipment effectiveness rca total productive maintenance 5s |
title | Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study |
title_full | Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study |
title_fullStr | Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study |
title_full_unstemmed | Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study |
title_short | Improvement of overall equipment efficiency with root cause analysis and TPM strategy: a case study |
title_sort | improvement of overall equipment efficiency with root cause analysis and tpm strategy a case study |
topic | overall equipment effectiveness rca total productive maintenance 5s |
url | https://www.riejournal.com/article_180277_99a37ad1b38454755fc6a29e6e83251d.pdf |
work_keys_str_mv | AT ahsanulabedin improvementofoverallequipmentefficiencywithrootcauseanalysisandtpmstrategyacasestudy |