Berth Allocation and Quay Crane Assignment Considering the Uncertain Maintenance Requirements
The strategic optimization of a container terminal’s quayside assets, including the berth and quay cranes, is crucial for maximizing their deployment and utilization. The interrelated and complex challenges of Berth Allocation (BAP) and Quay Crane Scheduling (QCSP) are fundamental to enhancing the r...
Saved in:
Main Authors: | Siwei Li, Liying Song |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-01-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/15/2/660 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Joint Optimization of Berths and Quay Cranes Considering Carbon Emissions: A Case Study of a Container Terminal in China
by: Houjun Lu, et al.
Published: (2025-01-01) -
Integrated Berth Allocation and Time-Variant Quay Crane Scheduling with Tidal Impact in Approach Channel
by: Xiaogang Jiao, et al.
Published: (2018-01-01) -
Wildlife of Florida Factsheets: Florida Sandhill Crane
by: Hannah Fox, et al.
Published: (2022-05-01) -
Design and Construction of a Hydraulic Crane.
by: Twinamasiko, Nicholas
Published: (2024) -
Process Optimization in Sea Ports: Integrating Sustainability and Efficiency Through a Novel Mathematical Model
by: Maria Teresa Pereira, et al.
Published: (2025-01-01)