Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels

The drill and blast method is widely used in constructing tunnels in rock. Unfortunately, blasting vibration can damage newly performed shotcrete layers which are major support structures to stabilize surrounding structures. Therefore, investigation of the influence of blasting on shotcrete and dete...

Full description

Saved in:
Bibliographic Details
Main Authors: Ao Li, Dingli Zhang, Qian Fang, Jiwei Luo, Liqiang Cao, Zhenyu Sun
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Shock and Vibration
Online Access:http://dx.doi.org/10.1155/2019/2429713
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832546515492536320
author Ao Li
Dingli Zhang
Qian Fang
Jiwei Luo
Liqiang Cao
Zhenyu Sun
author_facet Ao Li
Dingli Zhang
Qian Fang
Jiwei Luo
Liqiang Cao
Zhenyu Sun
author_sort Ao Li
collection DOAJ
description The drill and blast method is widely used in constructing tunnels in rock. Unfortunately, blasting vibration can damage newly performed shotcrete layers which are major support structures to stabilize surrounding structures. Therefore, investigation of the influence of blasting on shotcrete and determining reasonable distance between blasting work face and shotcrete position is of great importance. In this paper, a large-span tunnel excavated by drill and blast method acting as a high-speed railway station has been investigated. Blast vibration in the tunnel was recorded using microseismic monitoring technique. Empirical prediction equations for peak particle velocity (PPV) were obtained through regression analysis based on the obtained monitoring data. The attenuation law of tensile stress imposed on shotcrete layer due to blasting and bond strength of shotcrete-rock interface was also investigated. Minimum safety distance between shotcrete and blasting positions was calculated based on bond failure criterion. Evolution law considering different factors including blasting charge, rock mass class, and setting time of shotcrete was also obtained, which could be applied to determine blast charge shotcrete arrangements for tunnel constructions in future. The obtained results showed that the safety of shotcrete could be ensured and shotcrete falling off the rock could be prevented under current blast constructions.
format Article
id doaj-art-29d0c82f43e049ab87a04ef02786846e
institution Kabale University
issn 1070-9622
1875-9203
language English
publishDate 2019-01-01
publisher Wiley
record_format Article
series Shock and Vibration
spelling doaj-art-29d0c82f43e049ab87a04ef02786846e2025-02-03T06:48:16ZengWileyShock and Vibration1070-96221875-92032019-01-01201910.1155/2019/24297132429713Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway TunnelsAo Li0Dingli Zhang1Qian Fang2Jiwei Luo3Liqiang Cao4Zhenyu Sun5Key Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaKey Laboratory for Urban Underground Engineering of the Education Ministry, Beijing Jiaotong University, Beijing 100044, ChinaThe drill and blast method is widely used in constructing tunnels in rock. Unfortunately, blasting vibration can damage newly performed shotcrete layers which are major support structures to stabilize surrounding structures. Therefore, investigation of the influence of blasting on shotcrete and determining reasonable distance between blasting work face and shotcrete position is of great importance. In this paper, a large-span tunnel excavated by drill and blast method acting as a high-speed railway station has been investigated. Blast vibration in the tunnel was recorded using microseismic monitoring technique. Empirical prediction equations for peak particle velocity (PPV) were obtained through regression analysis based on the obtained monitoring data. The attenuation law of tensile stress imposed on shotcrete layer due to blasting and bond strength of shotcrete-rock interface was also investigated. Minimum safety distance between shotcrete and blasting positions was calculated based on bond failure criterion. Evolution law considering different factors including blasting charge, rock mass class, and setting time of shotcrete was also obtained, which could be applied to determine blast charge shotcrete arrangements for tunnel constructions in future. The obtained results showed that the safety of shotcrete could be ensured and shotcrete falling off the rock could be prevented under current blast constructions.http://dx.doi.org/10.1155/2019/2429713
spellingShingle Ao Li
Dingli Zhang
Qian Fang
Jiwei Luo
Liqiang Cao
Zhenyu Sun
Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
Shock and Vibration
title Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
title_full Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
title_fullStr Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
title_full_unstemmed Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
title_short Safety Distance of Shotcrete Subjected to Blasting Vibration in Large-Span High-Speed Railway Tunnels
title_sort safety distance of shotcrete subjected to blasting vibration in large span high speed railway tunnels
url http://dx.doi.org/10.1155/2019/2429713
work_keys_str_mv AT aoli safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels
AT dinglizhang safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels
AT qianfang safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels
AT jiweiluo safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels
AT liqiangcao safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels
AT zhenyusun safetydistanceofshotcretesubjectedtoblastingvibrationinlargespanhighspeedrailwaytunnels