Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam

In view of multiseam mining under goaf, the surrounding rock control problem of lower coal roadway will be affected by concentrated coal pillar left in upper coal seam goaf and dynamic pressure superposition of working face in this coal seam. Under the geological environment of No. 16 extrathick coa...

Full description

Saved in:
Bibliographic Details
Main Authors: Xiangye Wu, Shuai Wang, Chen Tian, Changxing Ji, Jingya Wang
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2020/8871925
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832547135155863552
author Xiangye Wu
Shuai Wang
Chen Tian
Changxing Ji
Jingya Wang
author_facet Xiangye Wu
Shuai Wang
Chen Tian
Changxing Ji
Jingya Wang
author_sort Xiangye Wu
collection DOAJ
description In view of multiseam mining under goaf, the surrounding rock control problem of lower coal roadway will be affected by concentrated coal pillar left in upper coal seam goaf and dynamic pressure superposition of working face in this coal seam. Under the geological environment of No. 16 extrathick coal seam in the Laoshidan coal mine and taking the working face 031604 as the research background, the reasonable docking position selection of the withdrawal roadway and the docking roadway in the middle mining period and the surrounding rock stability control problems of the withdrawal roadway and the docking roadway during the final mining period were studied by using the methods of field theoretical analysis, numerical simulation, and field measurement. The mechanical mechanism of the nonuniform failure of the retreating roadway and the docking roadway during the final mining period is shown, and the control method of the surrounding rock stability of the roadway is put forward and applied. The results show that (1) through the analysis of the superimposed stress under the concentrated coal pillar and the coal seam in advance, the specific butt joint position is arranged at 860 m away from the open-off cut, which is 10 m away from the goaf of No. 12 coal seam. (2) With the working face 031604 advancing through the process, the deviatoric stress value of the withdrawal roadway gradually increases, the maximum principal stress of the two sides of the roadway deflects clockwise from the vertical direction to the horizontal direction, its angle also gradually increases, and the shape of the plastic zone gradually expands from symmetry to asymmetry. (3) It is revealed that the peak value of deviatoric stress on both sides of the docking position of docking roadway increases gradually under the influence of mining and deflects anticlockwise to the vertical direction with the principal stress angle. The joint action of both is the mechanical mechanism that causes the plastic zone to expand in an asymmetric shape. (4) The coordinated control scheme of support (anchor bolt and anchor cable)—modified (grouting)—is adopted for the withdrawal roadway, and the coordinated control scheme of support (anchor bolt and anchor cable)—changing the cross-section shape of the roadway—is adopted for the docking roadway. The purpose of the smooth connection of working face and rapid and safe withdrawal of equipment is achieved on site.
format Article
id doaj-art-28206ace595d4cf9814e521f99dbec19
institution Kabale University
issn 1468-8115
1468-8123
language English
publishDate 2020-01-01
publisher Wiley
record_format Article
series Geofluids
spelling doaj-art-28206ace595d4cf9814e521f99dbec192025-02-03T06:45:51ZengWileyGeofluids1468-81151468-81232020-01-01202010.1155/2020/88719258871925Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal SeamXiangye Wu0Shuai Wang1Chen Tian2Changxing Ji3Jingya Wang4Institute of Mining Engineering, Inner Mongolia University of Science and Technology, Baotou 014010, ChinaInstitute of Mining Engineering, Inner Mongolia University of Science and Technology, Baotou 014010, ChinaBulianta Coal Mine, Shenhua Shendong Coal Group Corporation Limited, Ordos 017209, ChinaInner Mongolia Fucheng Mining Co., Ltd., Ordos 016217, ChinaInstitute of Mining Engineering, Inner Mongolia University of Science and Technology, Baotou 014010, ChinaIn view of multiseam mining under goaf, the surrounding rock control problem of lower coal roadway will be affected by concentrated coal pillar left in upper coal seam goaf and dynamic pressure superposition of working face in this coal seam. Under the geological environment of No. 16 extrathick coal seam in the Laoshidan coal mine and taking the working face 031604 as the research background, the reasonable docking position selection of the withdrawal roadway and the docking roadway in the middle mining period and the surrounding rock stability control problems of the withdrawal roadway and the docking roadway during the final mining period were studied by using the methods of field theoretical analysis, numerical simulation, and field measurement. The mechanical mechanism of the nonuniform failure of the retreating roadway and the docking roadway during the final mining period is shown, and the control method of the surrounding rock stability of the roadway is put forward and applied. The results show that (1) through the analysis of the superimposed stress under the concentrated coal pillar and the coal seam in advance, the specific butt joint position is arranged at 860 m away from the open-off cut, which is 10 m away from the goaf of No. 12 coal seam. (2) With the working face 031604 advancing through the process, the deviatoric stress value of the withdrawal roadway gradually increases, the maximum principal stress of the two sides of the roadway deflects clockwise from the vertical direction to the horizontal direction, its angle also gradually increases, and the shape of the plastic zone gradually expands from symmetry to asymmetry. (3) It is revealed that the peak value of deviatoric stress on both sides of the docking position of docking roadway increases gradually under the influence of mining and deflects anticlockwise to the vertical direction with the principal stress angle. The joint action of both is the mechanical mechanism that causes the plastic zone to expand in an asymmetric shape. (4) The coordinated control scheme of support (anchor bolt and anchor cable)—modified (grouting)—is adopted for the withdrawal roadway, and the coordinated control scheme of support (anchor bolt and anchor cable)—changing the cross-section shape of the roadway—is adopted for the docking roadway. The purpose of the smooth connection of working face and rapid and safe withdrawal of equipment is achieved on site.http://dx.doi.org/10.1155/2020/8871925
spellingShingle Xiangye Wu
Shuai Wang
Chen Tian
Changxing Ji
Jingya Wang
Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
Geofluids
title Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
title_full Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
title_fullStr Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
title_full_unstemmed Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
title_short Failure Mechanism and Stability Control of Surrounding Rock of Docking Roadway under Multiple Dynamic Pressures in Extrathick Coal Seam
title_sort failure mechanism and stability control of surrounding rock of docking roadway under multiple dynamic pressures in extrathick coal seam
url http://dx.doi.org/10.1155/2020/8871925
work_keys_str_mv AT xiangyewu failuremechanismandstabilitycontrolofsurroundingrockofdockingroadwayundermultipledynamicpressuresinextrathickcoalseam
AT shuaiwang failuremechanismandstabilitycontrolofsurroundingrockofdockingroadwayundermultipledynamicpressuresinextrathickcoalseam
AT chentian failuremechanismandstabilitycontrolofsurroundingrockofdockingroadwayundermultipledynamicpressuresinextrathickcoalseam
AT changxingji failuremechanismandstabilitycontrolofsurroundingrockofdockingroadwayundermultipledynamicpressuresinextrathickcoalseam
AT jingyawang failuremechanismandstabilitycontrolofsurroundingrockofdockingroadwayundermultipledynamicpressuresinextrathickcoalseam