Economic Evaluation of Three Available Solutions for Promotion of Wind Power Integration
The limited operational flexibility of combined heat and power (CHP) units is the main cause of wind power curtailment in the thermal-electrical power system of Northern China. Pumped hydrostorage (PHS), heat storage (HS), and electric boiler (EB) are investigated as three alternative options for th...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2017-01-01
|
Series: | International Journal of Rotating Machinery |
Online Access: | http://dx.doi.org/10.1155/2017/1618681 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|