Two Parallel Machines Scheduling with Two-Vehicle Job Delivery to Minimize Makespan
A problem of parallel machine scheduling with coordinated job deliveries is handled to minimize the makespan. Different jobs call for dissimilar sizes of storing space in the process of transportation. A range of jobs of one customer in the problem have priority to be processed on two identical para...
Saved in:
Main Authors: | Lisi Cao, Jianhong Hao, Dakui Jiang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2020/1647401 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan
by: Cuixia Miao
Published: (2014-01-01) -
Exact makespan minimization of unrelated parallel machines
by: Åblad, Edvin, et al.
Published: (2021-05-01) -
Two-machine flowshop scheduling problem to minimize makespan or
total completion time with random and bounded setup times
by: Ali Allahverdi, et al.
Published: (2003-01-01) -
A Local and Global Search Combine Particle Swarm Optimization Algorithm for Job-Shop Scheduling to Minimize Makespan
by: Zhigang Lian
Published: (2010-01-01) -
Two-Agent Scheduling to Minimize the Maximum Cost with Position-Dependent Jobs
by: Long Wan
Published: (2015-01-01)