Grid-Connected Semitransparent Building-Integrated Photovoltaic System: The Comprehensive Case Study of the 120 kWp Plant in Kunming, China
A 120 kWp building-integrated photovoltaic (BIPV) system was installed on the south facade of the Solar Energy Research Institute building in Yunnan Normal University. The area of the curtain wall was 1560 m2 (26 m × 60 m), which consisted of 720 semitransparent monocrystalline silicon double-glazin...
Saved in:
Main Authors: | Yunfeng Wang, Ming Li, Reda Hassanien Emam Hassanien, Xun Ma, Guoliang Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | International Journal of Photoenergy |
Online Access: | http://dx.doi.org/10.1155/2018/6510487 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluasi Sistem PLTS Grid-Connected 21.60 kWp di Politeknik Negeri Jakarta Dengan Metode Failure Mode Effect Analysis (FMEA)
by: Anisa Ramadhani, et al.
Published: (2024-08-01) -
Synergetic Control of Grid-Connected Photovoltaic Systems
by: Junjie Qian, et al.
Published: (2017-01-01) -
Design and fabrication of a device for cleaning greenhouse roofs
by: Ahmed Amin, et al.
Published: (2025-01-01) -
Study on the Optical Properties of Triangular Cavity Absorber for Parabolic Trough Solar Concentrator
by: Fei Chen, et al.
Published: (2015-01-01) -
Semitransparent Polymer Solar Cells Based on Liquid Crystal Reflectors
by: Shaopeng Yang, et al.
Published: (2014-01-01)