Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling
Schedulers can compress the schedule of construction projects by overlapping design and construction activities. However, overlapping may induce increased total cost with the decrease of duration. To solve the concurrency-based time-cost tradeoff problem effectively, this paper demonstrates an overl...
Saved in:
| Main Authors: | Guofeng Ma, Lingzhi Zhang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/9120795 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects
by: Ming Li, et al.
Published: (2014-01-01) -
Comparison of a Fuzzy Genetic and Simulated Annealing Algorithm Approach for Project Time-Cost Tradeoff
by: Nataša Glišović
Published: (2014-01-01) -
An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
by: Wenfa Hu, et al.
Published: (2014-01-01) -
Analysis of BIM in the Whole-Process Cost Management of Construction Projects
by: Lirong Liu, et al.
Published: (2022-01-01) -
Factors Affecting Soft Cost in BIM-Based Construction Projects
by: Abdelrahman M. Farouk, et al.
Published: (2025-07-01)