ANALISIS RISIKO DAN MITIGASI PADA PENGIRIMAN ALAT BERAT DENGAN METODE ERM

Heavy lift delivery activities are complex and complicated, the handling process is also different when compared to loads in general due to excess dimension factors, both length, width, and height. There are constraints and risks in the delivery of heavy equipment. This study aims to analyze operati...

Full description

Saved in:
Bibliographic Details
Main Authors: Tulus Martua Sihombing, Wahyudi Adiprasetyo, Yehezkhiel Shallom Irajani
Format: Article
Language:English
Published: Universitas Bina Bangsa 2024-12-01
Series:Jurnal Lebesgue
Subjects:
Online Access:https://lebesgue.lppmbinabangsa.id/index.php/home/article/view/760
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Heavy lift delivery activities are complex and complicated, the handling process is also different when compared to loads in general due to excess dimension factors, both length, width, and height. There are constraints and risks in the delivery of heavy equipment. This study aims to analyze operational risks arising from heavy equipment delivery activities at PT Daily Express Cargo. By analyzing the risks that may occur, it is expected that the company can take the right decisions and actions to overcome the risks. The research method used is the Enterprise Risk Management (ERM) method with descriptive analysis and qualitative approach. Data collection techniques through in-person interviews and questionnaires. In this study, twenty operational risks were found. After identification and risk assessment, there are four risk levels, namely high, medium, low, and very low levels. At a high level there are 2 risks, at a medium level there are 5 risks, at a low level there are 5 risks, and at a very low level there are 8 risks. Each risk that arises requires appropriate risk control tailored to its type
ISSN:2721-8929
2721-8937