Feasibility Study of a Building-Integrated PV Manager to Power a Last-Mile Electric Vehicle Sharing System
Transportation is one of the largest single sources of air pollution in urban areas. This paper analyzes a model of solar-powered vehicle sharing system using building-integrated photovoltaics (BIPV), resulting in a zero-emission and zero-energy mobility system for last-mile employee transportation....
Saved in:
Main Authors: | Manuel Fuentes, Jesús Fraile-Ardanuy, José L. Risco-Martín, José M. Moya |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2017-01-01
|
Series: | International Journal of Photoenergy |
Online Access: | http://dx.doi.org/10.1155/2017/8679183 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Corrigendum to “Feasibility Study of a Building-Integrated PV Manager to Power a Last-Mile Electric Vehicle Sharing System”
by: Manuel Fuentes, et al.
Published: (2025-01-01) -
Electric Vehicles in Last-Mile Delivery: A Bibliometric Review
by: Eric Mogire, et al.
Published: (2025-01-01) -
The Long Last Mile of Polio Eradication
by: Sanjay Chaturvedi
Published: (2024-04-01) -
The Last Mile: Safety Management Implementation in Construction Sites
by: Tingshen Zhao, et al.
Published: (2018-01-01) -
MULTICRITERIA EVALUATION OF SUSTAINABILITY IN LAST-MILE LOGISTICS: A REVIEW
by: Franco Corti, et al.
Published: (2024-11-01)