PROCUREMENT OF FERROTITIAN FROM METAL INDUSTRY WASTE BY METHOD OF ALUMOTHERMAL SYNTHESIS
Researches of procurement of ferrotitanium of Fti25 brand from waste products by method of aluminothermic synthesis are conducted. The thermodynamic analysis revealed that differences in using oxide of iron (Fe2O3) and iron cinder (Fe3O4) are subtle and it is confirmed by the experimental results. A...
Saved in:
Main Authors: | A. A. Zhukova, K. B. Podbolotov, A. A. Izyumov, V. V. Petrenko |
---|---|
Format: | Article |
Language: | English |
Published: |
Belarusian National Technical University
2017-10-01
|
Series: | Литьë и металлургия |
Subjects: | |
Online Access: | https://lim.bntu.by/jour/article/view/2134 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Deoxidization mechanism of preparation FeTi alloy using ilmenite concentrate
by: Hu M., et al.
Published: (2011-01-01) -
Production of ferroalloys in rotary tilting furnaces
by: S. L. Rovin, et al.
Published: (2021-12-01) -
Metallurgical industrial production development in Russia
by: D. M. Kucheryavenko
Published: (2024-02-01) -
Production of pyrolytic carbon from waste of rubber-containing products for use in foundry
by: A. S. Panasyugin, et al.
Published: (2023-08-01) -
Scientific support of modernization of the Holding «Belarusian Metallurgical Company»
by: P. A. Vityaz', et al.
Published: (2019-04-01)