Displacement Response Characteristics and Instability Risk Assessment of Excavation Face in Deep-Buried Shield Tunnel

To prevent the occurrence of excavation face instability incidents during shield tunneling, this study takes the Bailuyuan tunnel of the ‘Hanjiang-to-Weihe River Water Diversion Project’ as the engineering background. A three-dimensional discrete element method simulation was employed to analyze the...

Full description

Saved in:
Bibliographic Details
Main Authors: Chenyang Zhu, Xin Huang, Chong Xu, Guangyi Yan, Jiaqi Guo, Qi Liang
Format: Article
Language:English
Published: MDPI AG 2025-07-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/15/14/2561
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:To prevent the occurrence of excavation face instability incidents during shield tunneling, this study takes the Bailuyuan tunnel of the ‘Hanjiang-to-Weihe River Water Diversion Project’ as the engineering background. A three-dimensional discrete element method simulation was employed to analyze the tunneling process, revealing the displacement response of the excavation face to various tunneling parameters. This led to the development of a risk assessment method that considers both tunneling parameters and geological conditions for deep-buried shield tunnels. The above method effectively overcomes the limitations of finite element method (FEM) studies on shield tunneling parameters and, combined with the Analytic Hierarchy Process (AHP), enables rapid tunnel analysis and assessment. The results demonstrate that the displacement of the excavation face in shield tunnel engineering is significantly influenced by factors such as the chamber earth pressure ratio, cutterhead opening rate, cutterhead rotation speed, and tunneling speed. Specifically, variations in the chamber earth pressure ratio have the greatest impact on horizontal displacement, occurring predominantly near the upper center of the tunnel. As the chamber earth pressure ratio decreases, horizontal displacement increases sharply from 12.9 mm to 267.3 mm. Conversely, an increase in the cutterhead opening rate leads to displacement that first rises gradually and then rapidly, from 32.1 mm to 121.1 mm. A weighted index assessment model based on AHP yields a risk level of Grade II, whereas methods from other scholars result in Grade III. By implementing measures such as adjusting the grouting range, cutterhead rotation speed, and tunneling speed, field applications confirm that the risk level remains within acceptable limits, thereby verifying the feasibility of the constructed assessment method. Construction site strategies are proposed, including maintaining a chamber earth pressure ratio greater than 1, tunneling speed not exceeding 30 mm/min, cutterhead rotation speed not exceeding 1.5 rpm, and a synchronous grouting range of 0.15 m. Following implementation, the tunnel construction successfully passed the high-risk section without any incidents. This research offers a decision-making framework for shield TBM operation safety in complex geological environments.