Optimal Configuration of Spatial Planning for Energy-Efficient Buildings
The project phase is where the life-cycle of a building starts. The best decisions are made during the design or pre-project step. In terms of both economic resources and time, changes to specific design decisions made at this step are inexpensive compared to subsequent steps of architectural planni...
Saved in:
| Main Authors: | Figen Balo, Biljana Ivanović, Željko Stević, Alptekin Ulutas, Dragan Marinković, Hazal Boydak Demir |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
University North
2024-01-01
|
| Series: | Tehnički Glasnik |
| Subjects: | |
| Online Access: | https://hrcak.srce.hr/file/466468 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Hybrid Revit and a new MCDM approach of energy effective nursing-home designed by natural stone and green insulation materials
by: Figen Balo, et al.
Published: (2025-03-01) -
Research on BIM Technology of Green Building Based on GBSWARE Software
by: Hongmei Yin, et al.
Published: (2025-06-01) -
Reviewing of life cycle analysis of a structure with building information modeling
by: Hadi Faghihmaleki, et al.
Published: (2024-09-01) -
Cost performance analysis of green chemical industrial buildings using blockchain-BIM
by: Lastarida Sinaga, et al.
Published: (2025-03-01) -
Research on Energy-Saving Optimization of Green Buildings Based on BIM and Ecotect
by: Mengxue Zhao, et al.
Published: (2025-05-01)