Triple-Layer Genetic Algorithm (3LGA) for Project Scheduling and Material Ordering Problem with Limited Storage Space
Efficient project management in the construction industry depends on optimizing project scheduling and material ordering, two interdependent processes that significantly impact both costs and durations. Traditional approaches often address these processes separately, neglecting the trade-offs betwee...
Saved in:
| Main Authors: | Suphawut Malaikrisanachalee, Narongrit Wongwai, Pongpan Promchun |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-03-01
|
| Series: | Buildings |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2075-5309/15/7/1040 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
ESPCN-YOLO: A High-Accuracy Framework for Personal Protective Equipment Detection Under Low-Light and Small Object Conditions
by: Suphawut Malaikrisanachalee, et al.
Published: (2025-05-01) -
A note on ordered planes
by: Margaret A. Gamon, et al.
Published: (1992-01-01) -
Integrated Scheduling of Automated Yard Cranes and Automated Guided Vehicles with Limited Buffer Capacity of Dual-Trolley Quay Cranes in Automated Container Terminals
by: Doaa Naeem, et al.
Published: (2022-12-01) -
Separation properties of the Wallman ordered compactification
by: D. C. Kent, et al.
Published: (1990-01-01) -
Algorithm for Solving Distributed Workshop Scheduling Model Based on Order Constraints and Assembly Constraints
by: Tingting Qu
Published: (2025-01-01)