Numerical Simulation of the Construction Process of Long Spiral CFG Piles
A numerical model for the construction process of long spiral CFG piles is established based on the coupled Eulerian–Lagrangian method. The construction process is divided into drilling process and concrete pouring process for modeling. The influence of long spiral CFG piles construction on saturate...
Saved in:
Main Authors: | Taotao Wang, Siyi Du |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6664474 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Numerical Analysis on the Load Sharing Performance of Long-Short CFG Pile Composite Foundation Subjected to Rotation of Adjacent Retaining Wall
by: Bantayehu Uba Uge, et al.
Published: (2021-01-01) -
Settlement Analysis of Saturated Tailings Dam Treated by CFG Pile Composite Foundation
by: Jinxing Lai, et al.
Published: (2016-01-01) -
Stress Analysis of CFG Pile Composite Foundation in Consolidating Saturated Mine Tailings Dam
by: Jinxing Lai, et al.
Published: (2016-01-01) -
Numerical Simulation Study on Lateral Displacement of Pile Foundation and Construction Process under Stacking Loads
by: Yan-yan Cai, et al.
Published: (2018-01-01) -
Analysis of Cumulative Damage Characteristics of Long Spiral Belled Pile under Horizontal Cyclic Loading at Sea
by: Haian Liang, et al.
Published: (2021-01-01)